Laserfiche WebLink
Lakes at Waterway Village Plat Pod M,N,O,P <br /> FINAL LIFT BOND-OPC 4/26/2021 <br /> PAVING <br /> DESCRIPTION QUANTITY UNIT UNIT COST TOTAL <br /> 1"ASPHALT(FINAL COURSE)-Pods M,N,O,P 18,600 SY $ 9.78 $ 181,908.00 <br /> SIGNING AND STRIPING 1 LS $ 8,000.00 $ 8,000.00 <br /> SET PRM'S,PCP'S,LOT CORNERS 1 LS $ 20,000.00 $ 20,000.00 <br /> TOTAL $ 209,908.00 <br /> TOTALS $ 209,908.00 <br /> PROPOSED BOND AMOUNT(125%) $ 262,385.00 <br /> \ <br /> `.`,_ . . . l; , . <br /> > <br /> \ ckR (' i/ <br /> Kf nIe lHorny": • oci• 7sy1nC./ <br /> ti ' STATE OF FLORIDA <br /> C. •., INDIAN RIVER COUNTY <br /> * : / i THIS IS TO CERTIFY THAT THIS IS <br /> 7t- A TRUE AND CORRECT COPY OF <br /> � i-U ' THE ORIGINAL ON FILE IN THIS <br /> lF1* Husainy;P•'E: O� 4'�� OFFICE. <br /> F[4`9g°#75481`�,n„�;C`I''. ,r;�� FERE R.S IT ,CL@RK <br /> D.c <br /> KiiiiJeyHorn DATE i A1 i ,er <br /> The Engineer has no control over the cost of labor,materials,equipment,or over the Contractor's methods of determining prices or over competitive <br /> bidding or market conditions.Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only <br /> the Engineer's judgment as a design professional familiar with the construction industry.The Engineer cannot and does not guarantee that proposals,bids, <br /> or actual construction costs will not vary from its opinions of probable costs. <br /> IRC ENGWEEFRNS <br /> Ac ed -i z Z! <br /> I nguffiCi'enf <br /> EXHIBIT "A" <br />