My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/13/2021
CBCC
>
Meetings
>
2020's
>
2021
>
04/13/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 2:00:06 PM
Creation date
6/7/2021 12:30:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/13/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 438074-1-54-01 <br />This exhibit forms an integral part of the Local Agency ;Program Agreement between the State of Florida, Department of <br />Transportation and <br />INDIAN RIVER COUNTY (the Recipient) <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 1.814 Miles. 6TH AVENUE FROM SR-5/US-1 (MP 0.000) TO 21ST <br />STREET (MP 1.814) <br />PROJECT DESCRIPTION: Milling, resurfacing and pavement markings along with drainage improvements on 61' Avenue <br />from SR-5/US-1 to 21st Street. <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Recipient is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Construction to be completed by December 31, 2023. <br />If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: <br />The CEI consultant cannot be the Engineer of Record (EOR) for the project. The Department will not execute this <br />Agreement, until the final plans, for the Project, have been approved and until all construction work including a <br />Maintenance map is showing all resurfaced areas are within the existing right of way. In addition, the County will not be <br />able to proceed with construction of the project, until the Department provides the Recipient Notice to Proceed. <br />90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.