My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-065A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-065A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 10:29:29 AM
Creation date
6/7/2021 1:18:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/20/2021
Control Number
2021-065A
Agenda Item Number
12.H.1.
Entity Name
Centerline, Inc.
Subject
Indian River County North County Water and Sewer System Phase 2 Agreement
Bid Number
2021019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 2 ENGINEER <br />The North County Water & Sewer System Phase 2 has been designed by Masteller & Moler, Inc., <br />hereinafter called ENGINEER, and who is to act as OWNER'S representative, assume all duties <br />and responsibilities and have the rights and authority assigned to ENGINEER in the Contract <br />Documents in connection with completion of the work in accordance with the Contract <br />Documents. <br />ARTICLE 3 CONTRACT TIMES <br />3.1 The CONTRACTOR shall be substantially completed with the following timeframe: <br />(a) Within 60 calendar days from effective date of Notice to Proceed, Contractor shall <br />complete the following tasks: <br />1. Obtain all necessary permits. <br />2. Receive approved shop drawings for all materials and equipment to <br />be utilized on the job. <br />3. Perform all photographic recording and documentation of <br />conditions prior to construction. <br />4. Locate all existing utilities in the area of work. <br />5. Submit and secure approval of shop drawings. <br />6. Mobilize all labor, equipment, and materials. <br />7. Deliver and store all equipment and materials to the job site. <br />8. Notify all utilities and other affected parties prior to initiating <br />construction. <br />(b) From 61 calendar days to 300 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Install all pipe and appurtenant items. <br />2. Perform all testing. <br />3. Restore all disturbed areas to their pre -construction condition. <br />4. Correct all deficiencies noted by Engineer. <br />Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes <br />Substantial Completion. <br />(c) From 301 calendar days to 360 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />2. Remove all equipment and material from project site. <br />3. Perform contract closeout procedures. <br />3.2 Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final <br />Completion. <br />3.3 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence <br />of this Agreement and that OWNER will suffer financial loss if the work is not completed <br />within the times specified in Paragraphs 3.1 and 3.2 above, plus any extensions thereof <br />allowed in accordance with Article 12 of the General Conditions. They also recognize the <br />delays, expense and difficulties involved in proving in a legal proceeding the actual loss <br />00530-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.