My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/15/2020 (3)
CBCC
>
Meetings
>
2020's
>
2020
>
12/15/2020 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 9:05:15 AM
Creation date
6/15/2021 10:00:44 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/15/2020
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This project will optimize the recovery of the Upper Floridan Aquifer (UFA) water source from 75% to 85% through <br />the installation of a new membrane array and optimization of dedicated R.O. trains to pumps. The plant is currently <br />constrained regarding maximizing recovery from the UFA, and the improvements will maximize the limited source <br />supply while complying with limited concentrate disposal resources. Once complete, the project would provide an <br />additional 0.94 million gallons a day (I\2GD) of potable water from the same initial water source, resulting in an increase <br />in storage capacity of 343 million gallons a year (MGI) in the Upper Floridan Aquifer. <br />The project would provide water quality improvements to the Central Indian River Lagoon by reducing TN loads by <br />5,494 lbs. per year and TP loads by 143 lbs. per year. Total project cost estimate is $11,296,680. <br />Position: Indian River County BCC respectfully requests the Legislature SUPPORT an appropriation of <br />$1,129,668 toward the South R.O. Plant Enhanced Recovery Project. <br />12 <br />1l7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.