My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-083
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2021 10:46:20 AM
Creation date
6/15/2021 10:23:15 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. MM -2 <br />Moorhen Marsh Structural Construction Phase Services <br />reinforcing steel layout for; the structures identified below. The Consultant will <br />work with the COUNTY'S inspector for the reinforcing steel layout of identical <br />structures. It is anticipated that the COUNTY'S Inspector will inspect the <br />reinforcing steel layout for the remaining identical structures and coordinate <br />with the Consultant as needed. For structures where site visits are not indicated <br />below, it is anticipated that the COUNTY'S Inspector will be responsible for <br />inspecting the reinforcing steel layout. <br />Below is a list of structures; <br />• [(# of Identical Structures) Structure name (# visits anticipated)] <br />o (8 wall Pairs) WLS Concrete Ingress/Egress Ramp Walls (1 visit) <br />o (8) Structures S8 -S15 (1 visit) <br />o (8) WLS / Solids Sump wall (1 visit) <br />o (8) Discharge Wier Wall (1 visit) <br />o (8) Platform Wall (0 visits) <br />o (8 Wall Pairs) Discharge/ Reoxygenation Flume Walls (1 visit) <br />o (2) Solids Sump Elevated Perimeter Curb (0 visits) <br />o (3) Solids Sump Elevated Divider Curb (0 visits) <br />o (8) WLS Perimeter Curb (1 visit) <br />o (3) WLS Divider Curb (0 visits) <br />o (2) Solids Holding Basin Ramp Wall (0 visits) <br />o (1) Structure S16 (0 visits) <br />o (1) Structure S1(1 visit) <br />o (1) Headworks (4 visits) <br />Three (3) Site visits are anticipated to observe the pouring, jointing, and curing <br />of the various slabs on grade. The Consultant will work with the COUNTY'S <br />inspector for the slab on grade site visit. It is anticipated that the COUNTY'S <br />Inspector will observe the remaining slab on grade work and coordinate with <br />the Consultant as needed. No Site visits are anticipated to observe concrete <br />pours. It is anticipated that the COUNTY's inspector will observe the concrete <br />pours and coordinate with the Consultant as needed. <br />ti <br />Such observations will not be exhaustive or extend .to every aspect of <br />Contractor's work. Observations will to be limited to spot checking, selective <br />measurement, and similar methods of general observation. Based on <br />Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.