My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-083
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2021 10:46:20 AM
Creation date
6/15/2021 10:23:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/08/2021
Control Number
2021-083
Agenda Item Number
8.W.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No. MM-2 for Engineering Services for Construction of
Moorhen Marsh Low Energy Aquatic Plant System
Project Number
IRC-1909
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. MM -2 <br />Moorhen Marsh Structural Construction Phase Services <br />Below is a list of anticipated shop drawings; <br />• Concrete/Material Mix Design <br />• Bill of Reinforcing (structures listed below) <br />o WLS Concrete Ingress/Egress Ramp Walls <br />o Structures S8 -S15 <br />o WLS / Solids Sump wall <br />o Discharge Wier Wall <br />o Platform Wall <br />o Discharge/ Reoxygenation Flume Walls <br />o Solids Sump Elevated Perimeter Curb <br />o Solids Sump Elevated Divider Curb <br />o WLS Perimeter Curb <br />o WLS Divider Curb <br />o Solids Holding Basin Ramp Wall <br />o Structure S16 <br />o Structure S1 <br />o Headworks <br />• Metal Fabrications (Grating & Supports) <br />o Structure S1 <br />o Headworks <br />• Hatch <br />• Handrail Layout and Connections <br />• Shoring and Formwork <br />• Temporary Retaining Wall or cofferdam <br />• Waterstops (Material and Layout) <br />• Pouring and Curing Sequence <br />7. Substitutes and "or -equal." Consultant will evaluate and determine the <br />acceptability of substitute or "or -equal" materials and equipment proposed by <br />Contractor in accordance with the Contract Documents. <br />8. Inspections and Tests.. j Consultant may require special inspections or tests of <br />Contractor's work as 'Consultant deems appropriate, and may receive and <br />review certificates of inspections within Consultant's area of responsibility or of <br />tests and approvals required by laws or the Contract Documents. Consultant's <br />review of certificates will be for the purpose of determining that the results <br />Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.