Laserfiche WebLink
Consultant will present high level costs, estimated impacts to treatment and treatment <br /> equipment, operational impacts associated with feasible scenarios. Consultant will <br /> summarize findings in a tabulated format and include graphs,tables, and maps as <br /> necessary. <br /> Consultant will prepare a brief technical memo supporting the Well Options Matrix, <br /> along with high level recommendations that support the matrix. The matrix table will <br /> include options with the following criteria: <br /> • Advantages/disadvantages <br /> • Impacts to treatment <br /> • Intangibles such as permitting, operating cost impacts, long-term <br /> sustainability,etc. <br /> • Impacts to distribution system <br /> • Capital costs <br /> • Schedule impacts <br /> Consultant will attend two(2)review meetings with IRC staff to discuss the findings <br /> from the Options Matrix. The first meeting is intended to discuss the draft matrix prior to <br /> completion of Task 2 and the second meeting is intended to finalize the matrix following <br /> completion of Task 2. Consultant will prepare and distribute meeting minutes to project <br /> team. <br /> Consultant recognizes that CDM is assisting IRCDU in this analysis by performing <br /> groundwater modeling of various potential wellfield locations and depths. Consultant <br /> will provide information and assistance to CDM to ensure such groundwater modeling is <br /> performed accurately and timely. <br /> Task 6—North County Upper Floridan Aquifer Performance Testing(APT) & <br /> Analysis <br /> Consultant will conduct groundwater modeling evaluation of the Hobart wellfield APT <br /> with CDM Model and Reporting, consisting of a review and evaluation of the existing <br /> CDM model and modification of the CDM Model to simulate the Hobart APT during the <br /> same time period and pumping conditions as used for the previous JLA model and APT <br /> evaluation. Following model simulations, Consultant, along with JLA' support generate a <br /> brief technical memorandum to be submitted electronically summarizing the evaluation <br /> procedure, and results. <br /> F:\Utilities\UTILITY-Engineering\WATER\CUP-10524\Admin\KHA\2021.5.1-FINAL AWS Eval Scope th <br /> MDM_vb.docx <br /> Page 7of11 <br />