My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2021 11:11:16 AM
Creation date
6/17/2021 9:55:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/08/2021
Control Number
2021-082A
Agenda Item Number
8.O.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Work Order No. 41, Oslo Road Improvement Project
Area
58th Avenue to 82nd Avenue
Project Number
FDOT Project 431521-1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
View images
View plain text
3. All specifications shall reference the FDOT Specifications for Road and Bridge <br />Construction and/ or Indian River County Utility Standards. Any deviations or special <br />specifications not included in specifications will be provided in the Technical <br />Specifications. <br />4. It is our understanding that FDOT will provide the currently developed Oslo Road <br />Constructability Submittal plans along with appropriate digital (.dgn) files to facilitate the <br />proposed utility improvements. <br />The proposed utility improvements will be submitted to the COUNTY for review and comment at <br />Preliminary (30%), Constructability (60%), Biddability (90%) and Production (100%) design <br />submittal stages. Review submittals will consist of three (3) hard copies of utility plans along <br />with an opinion of probable construction cost. It is understood that the Consultant will be <br />required to represent the utility improvements as either reimbursable or non -reimbursable <br />improvements. <br />B. Utility Permit: <br />To support the above described utility improvement, the Consultant will prepare and submit a <br />Florida Department of Environmental Protection (FDEP) Specific Permit to Construct Public <br />Water Systems Components and an IRFWCD Application for Utility Construction Permit. <br />Permit agency coordination assumes one (1) request for additional information (RAI) to be <br />received from FDEP and IRFWCD associated with the applications. The Consultant has included <br />the $650 FDEP application fee within the work order fee. The Final Plans will be provided in <br />Autodesk Civil 3D format. <br />It is anticipated that the utility improvement plans will be submitted to the FDOT to review (4 <br />separate submittal reviews) and approve under the FDOT Electronic Review Comment (ERC) <br />System. <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).