My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2021 11:11:16 AM
Creation date
6/17/2021 9:55:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/08/2021
Control Number
2021-082A
Agenda Item Number
8.O.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Work Order No. 41, Oslo Road Improvement Project
Area
58th Avenue to 82nd Avenue
Project Number
FDOT Project 431521-1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately twelve (12) months from the Notice to Proceed (NTP). <br />NTP contingent upon BOCC approval <br />Preliminary Submittal (30% Design Drawings) 4 months following NTP <br />Constructability Submittal (60% Design Drawings) 7 months following NTP <br />Biddability Submittal (90% Design Drawings) 10 months following NTP <br />Permit Submittal 10 months following NTP <br />Production Submittal (100% Design Drawings) 12 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />
The URL can be used to link to this page
Your browser does not support the video tag.