Laserfiche WebLink
Summary <br />Contract/Proposal <br />Preliminary Engineering <br />Final Engineering <br />Premitting <br />Bid Docs <br />Construction Administration <br />Draftsman / <br />Construction <br />Engineer/ Principal Admin/Clerical Manager <br />3 3 1 <br />12.5 5.5 26 <br />16 2 52 <br />6 7 8 <br />20 19 10 <br />20.5 11 135 <br />Total Hours <br />78 47.5 232 <br />x 165 is 66 x $93.50 <br />Total Fee <br />$12,870.00 $3,135.00 $21,692.00 <br />Total <br />$37,697.00 <br />Consultants <br />Surveyor <br />$4,250.00 <br />Geotechnical <br />$3,000.00 <br />Reimbursables <br />$2,500.00 <br />Other adjustments <br />(Deduction) <br />$2,697.00 <br />TOTAL ESTIMATED COST <br />$44,750.00 <br />