My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/04/2021
CBCC
>
Meetings
>
2020's
>
2021
>
05/04/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 10:38:26 AM
Creation date
6/24/2021 10:07:57 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/04/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I W14 60 11: <br />7. Our services will inchudctltc costs of mechanical, electrical. plumbin`, and structural consultants <br />used to develop the construction documents asmeeded. We will assist in bid.•iing administration, <br />answering bid qucstiuns as, needed. <br />8. The Architect ++ill provide limited construction administration Miiclt could include periodic <br />Omtruction obsen•ation at a ntinitiium of twice a m lath during construction, shop dmwing <br />review and requests for intorntatiort (AEI's), re+•iew4pay applications and monthly constntction <br />ulcetirt,gs. <br />K. Deliverables <br />The Architect will: provide the fol lou'ine, ciocunnents or electronically sealed set. <br />l;► ; sets ot'signed and scaled consintction documents. <br />?) Meetings %vith.ON'ner as .needed. <br />3) Mcctings with Nrmitti.ng agencies having jurisdiction over the project as needed. Note: <br />The proposed plans tnu t receive Indian River, County building lx-rmit. Any- site utility <br />desimi will be lav Other. <br />4) AutkAD riles to be delivered to Owner at.100°%submittal. <br />11•'e anticipate the followlnL- schedule: <br />Task <br />1. Eicld -v+Or{:. establish.base shots <br />11. Complete construction documents <br />111. tiidrling, buildin.. permit. rc:+ie+v' <br />IV. Construction <br />C. Owncr's Rcymunsibility <br />The 0%%mer's Responsibilities ,hal l he ns 12011u++N: <br />1. Provide ani existing dra+�iwi ' in•vevs�'CAD hit S-. <br />2. Civil engineer cousultant.ltcs il'tZctd+d. <br />3.: All permit,and al)pl ieatinn fees. <br />4. Ashestos abatement/survey if needed. <br />Termite consultanOreatments if deemed nece .srv. <br />6. Any runf rglaccrncniAr pairs if needed. <br />Duration <br />8 weeks <br />10 weeks <br />8 N+ceks <br />8 months <br />80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.