My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-077A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-077A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 10:02:34 AM
Creation date
6/24/2021 11:10:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/18/2021
Control Number
2021-077A
Agenda Item Number
8.I.
Entity Name
Masteller & Moler, Inc.
Subject
CCNA-2018 Work Order No. 10 for the North Sebastian Water & Sewer Project
Phase 2 – Construction Engineering & Inspection
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Observe the Contractor's construction activities and materials incorporated into the work during <br />periodic site visits. <br />• Prepare and maintain written reports of the Contractor's progress and of significant events <br />affecting the work. <br />• Record noteworthy incidents or events with video and/or still photography. <br />• Observe and document construction testing activities — including materials testing, utility <br />testing, and other related activities. <br />• Observe start-up of pumping systems to verify proper operation. <br />8. Review, comment and recommend approval to County of As -built plans. <br />9. Coordinate and conduct punchlist procedures beginning with Initial Walkthrough within five (5) <br />days of Substantial Completion, and prepare Final Punchlist after construction completion. <br />10. Assemble data and provide project close-out procedures and Engineer's Certifications as required. <br />Upon satisfaction that items of work have been completed in substantial conformance with the <br />project documents, our office will assemble a construction completion package which will be <br />submitted to the Utilities Dept. The package will include inspection reports; field survey data <br />provided by the Contractor; testing data and final As -built plans provided by the Contractor. <br />Deliverables —The ENGINEER shall provide the COUNTY: <br />a. Final Project Construction Completion Documents <br />TIME SCHEDULE <br />The estimated time frame for completion of services: <br />1 Hard Copy Set & 1 Electronic <br />Task A — Construction Administration / Observation (after Selected 360 Calendar Days <br />Contractor's Notice of Commencement Date) <br />FEE SCHEDULE <br />Masteller & Moler, Inc. proposes to provide the outlined Scope of Services based on the following fees: <br />Task A — Project Construction Administration & $ 184,545.00 <br />Observation Services (Not To Exceed Fee - <br />See Attached Estimated Fee Breakdown) <br />File#1422-2 <br />(1422-2_S2S_Phase2-CEI_WorkOrder_21-0510.docx) Exhibit "A" - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.