My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-070
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2021 4:10:51 PM
Creation date
6/24/2021 1:17:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/04/2021
Control Number
2021-070
Agenda Item Number
8.K.
Entity Name
Federal Emergency Management Agency (FEMA)
Subject
Jones’ Pier Conservation Area Public Improvements Hazard Mitigation Assistance
Federally-funded Sub Award and Grant Agreement No. H0566
Project Number
4283-91-R
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g) Verification that the property located within a SFHA is covered by an NFIP flood insurance policy <br />to the amount at least equal to the project cost or to the maximum limit of coverage made <br />available with respect to the particular property, whichever is less. <br />h) Confirmation that the Sub -Recipient (or property owner) has legally recorded with the county or <br />appropriate jurisdiction's land records a notice that includes the name of the current property <br />owner (including book/page reference to record of current title, if readily available), a legal <br />description of the property, and the following notice of flood insurance requirements: <br />"This property has received Federal Hazard Mitigation Assistance. Federal law requires that <br />flood insurance coverage on this property must be maintained during the life of the property <br />regardless of transfer of ownership of such property, pursuant to 42 U.S.C. §5154x, failure to <br />maintain flood insurance on this property may prohibit the owner from receiving Federal disaster <br />assistance with respect to this property in the event of a flood disaster. The property owner is <br />also required to maintain this property in accordance with the floodplain management criteria of <br />44 CFR 60.3 and City/County Ordinances. " <br />J) Archeological Materials — Project affects undisturbed ground — potential for presence of <br />archeological resources. Projects that involve groundbreaking shall need written verification <br />from the Sub -Recipient that no archeological materials were discovered during project <br />construction. <br />j) Verification letter certifying that work followed the Secretary of the Interior's Standards for <br />Rehabilitation as codified in 36 CFR 67.7. (Foundation screening via picket will be placed at the <br />bottom of the house in replica of the existing picket, New foundation piers will mimic existing with <br />use of concrete/CMU, New front steps will mimic existing concrete stairs, Appropriate foundation <br />plantings native to the area and reminiscent of those found at historic homesteads (to include <br />hibiscus and other similar shrubs) shall be included. <br />k) Permit(s) and verification of compliance; if no permit was needed a letter stating, "No permit <br />required". <br />1) Proof of compliance with Project Conditions and Requirements contained herein. <br />3) During the course of this agreement, the Sub -Recipient shall submit requests for reimbursement. <br />Adequate and complete source documentation shall be submitted to support all costs (federal share <br />and local share) related to the project. In some cases, not all project activities may be fully complete <br />prior to requesting reimbursement of costs incurred in completion of this scope of work; however, a <br />partial reimbursement may be requested. <br />The Sub -Recipient shall submit an Affidavit signed by the Sub -Recipient's project personnel with <br />each reimbursement request attesting to the completion of the work, that disbursements or payments <br />were made in accordance with all agreement and regulatory conditions, and that reimbursement is <br />due and has not been previously requested. ; <br />The Sub -Recipient shall maintain accurate time records. The Sub -Recipient shall ensure invoices <br />are accurate and any contracted services were rendered within the terms and timelines of this <br />agreement. All supporting documentation shall agree with the requested billing period. All costs <br />submitted for reimbursement shall contain adequate source documentation which may include but <br />not be limited to: cancelled checks, bank statements, Electronic Funds Transfer, paid bills and <br />invoices, payrolls, time and attendance records, contract and subcontract award documents. <br />Construction Expense: The Sub -Recipient shall pre -audit bills, invoices, and/or charges submitted <br />by the contractors and subcontractors and pay the contractors and subcontractors for approved bills, <br />invoices, and/or charges. Sub -Recipient shall ensure that all contractor/subcontractor bills, invoices, <br />and/or charges are legitimate and clearly identify the activities being performed and associated costs. <br />Project Management Expenses: The Sub -Recipient shall pre -audit source documentation such as <br />payroll records, project time sheets, attendance logs, etc. Documentation shall be detailed <br />information describing tasks performed, hours devoted to each task, and the hourly rate charged for <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.