Consultant will respond to a reasonable and appropriate Contractor requests for information and <br />issue necessary clarifications and interpretations of the Contract Documents to Client as <br />appropriate to the orderly completion of Contractor's work. Any orders authorizing variations <br />from the Contract Documents will be made by the Owner. <br />Consultant may recommend Work Change Directives, or Change Orders to the Owner and will <br />review and make recornmendations related to Change Orders submitted or proposed by the <br />Contractor. <br />Consultant will evaluate and determine the acceptability of substitute or "or -equal" materials and <br />equipment proposed by Contractor in accordance with the Contract Documents, but subject to the <br />provisions of applicable standards of state or local government entities. <br />Consultant will attend a Pre -Construction Conference prior to commencement of Work at the Site <br />and attend up to 30 monthly progress meetings at the work site, which is anticipated to be up to 24 <br />months. The last six months of the project duration, it is assumed that twice per month progress <br />meetings will be scheduled. Consultant will prepare meeting agenda for each monthly progress <br />meetings. Within one week of each respective progress meeting, Consultant will prepare and <br />distribute meeting minutes that summarize the major discussion topics from the meeting. <br />Consultant will provide on-site construction observation services during the construction phase. It <br />is assumed that construction contract duration will be approximately 24 months and observation <br />will occur throughout that time frame., Consultant representative will visit the site up to two <br />hundred and fifty (250) times during the expected anticipated 24 -month construction duration. It is <br />assumed that the first 3-4 months of the project will consist primarily of shop drawing review and <br />will require minimal on-site observations to be made by the Consultant, approximately weekly per <br />month. The remaining twenty (20) months of the project require the Consultant to be on-site on a <br />more frequent basis since the project will be under active construction. Consultant assumes this <br />20 -month period of construction will require approximately two to three (2 — 3) visits per week per <br />month to observe the work for conformance with the Contract Documents. Such visits and <br />observations by the Consultant representative are not intended to be exhaustive or to extend to <br />every aspect of Contractor's work in progress. Observations are to be limited to spot checking, <br />selective measurement, and similar methods of general observation of the Work based on <br />Consultant representative's exercise of professional judgment. Based on information obtained <br />during such visits and such observations, Consultant's representative will evaluate whether <br />Contractor's work is generally proceeding in accordance with the Contract Documents, and <br />Consultant will keep Owner informed of the general progress of the Work. <br />Consultant's inspector will prepare field reports of each site visit describing observations witnessed <br />during site visits. <br />The purpose of Consultant representative's site visits will be to enable Consultant to better carry <br />out the duties and responsibilities specifically assigned in this Agreement, and to provide the <br />OWNER a greater degree of confidence that the completed Work will conform in general to the <br />Contract Documents. Consultant shall not, during such visits or as a result of such observations of <br />Contractor's work in progress, supervise, direct, or have control over Contractor's work, nor shall <br />the Consultant have authority over or Iresponsibility for the means, methods, techniques, equipment <br />choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for <br />safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to <br />comply with laws and regulations applicable to Contractor's furnishing and performing the Work. <br />K: IWPB_CirillGenerallBlackIFloridalIRCUlOslo WTP Construction Phase120210525 - Oslo CPSScope.doc Page.2 of 6 <br />Indian River County Utilities Department <br />