Laserfiche WebLink
Consultant will perform programming for new membrane CI P system, new caustic tank and new <br />CO2 tank <br />TIME SCHEDULE <br />Consultant anticipates construction duration .of twenty-four (24) months will be required. <br />FEESCHEDULE <br />We will provide these services in accordance with our Agreement for Professional Services for <br />Water Plant and Water Resources Engineering Services — RFQ 2019070, dated November 5, 2019, <br />by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida <br />("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). <br />The Consultant will provide professional services on a lump sum fee basis as follows: <br />Task No. Task <br />Task Fee <br />Task 1 Construction Phase Services <br />$ 865,774 <br />Task 2 Programming and Integration <br />$ 356,772 <br />Total Lump Sum Fee = <br />$ 1,222,545 <br />ADDITIONAL SERVICES <br />The following services are not included in the Scope of Services for this project but may be <br />required depending on circumstances that may arise during the execution of this project. <br />Additional services include, but may not be limited to the following: <br />• Construction phase services beyond what is described herein <br />• Re -design or integration beyond what is listed <br />KMI'll W7P Construction Phase120210525 -Oslo CPS Scope.doc Page 5 of 6 <br />Indian River Count), Utilities Department <br />