My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-085A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-085A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 5:03:42 PM
Creation date
7/2/2021 4:55:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2021
Control Number
2021-085A
Agenda Item Number
8.D.
Entity Name
Florida Site Contracting
Subject
4th Street Culvert Replacement at 90th Avenue,
Project Number
IRC-2022
Bid Number
2021045
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Substantial Completion. Promptly thereafter, <br />OWNER, CONTRACTOR, and ENGINEER shall <br />make an inspection of the Work to determine the status <br />of completion. If ENGINEER does not consider the <br />Work substantially complete, ENGINEER will notify <br />CONTRACTOR in writing giving the reasons therefore. <br />If CNI(_INICCD PARROPIPM +he WArk 13101A n+ially s <br />GM <br />ple+e ENGINEER EER will pFepaFe anal .deliver to UA/AICD <br />Shall-fx the date .,f SubstaRtial GGFnpletien. T-heFe <br />shall he ad+aehe.d b, the Aer+ifiAa+e a +en+a+iye Co+ Af <br />+teas be-Gempleted-6F GOFFeGted befc�e fina: <br />paymeRt. Q1 " A , INIER shall have revei; days after r-IBGeipt <br />Af+hethe ten+a+i..e se.+ifiAa+e .d. WhiAh +A make written <br />AhieAtk)R +e CNG—INICCG as to '. PIPOVAf +he <br />certificate $l: attaGhed lost. if, afteF GGIRsideFing GUGh <br />ehieGtiens CNIGINICCs nsl, -dpl; +ha++he Wr)rk is not <br />substantialC? substantially GGIMnlete ENGINEER EER ,.,ill ..d+hin do days <br />af+er s. hmissien Af +he +en+a+i.,e Ae.+ifisa+e +e f1\A/AICI? <br />therefer. If, after- ;;tiAA of 9W NIER's <br />AhieA+ienc CNIGINICCl7 n siders the 1A/A.L subsMn <br />tially Gemplete, ENGINEER will ..a+hin said 14 .days <br />Feyised teRtatiVe list of iteR}G +e he nle+e.d <br />AArre Gte.d1 eAes+in Gh sha frn +he <br />..�l"+en+a+i. <br />seftfin-roateas€PI(vIA€€RheGyes�cstife�af+ <br />e <br />NER. At the <br />F <br />tom e of delove <br />GGFFlnle+iGR ENGINEER EER will rdeli..er +e OWNER anal <br />rlivisien Of sihili+ies pending final en+ <br />ain+enaRGe heat, � <br />utilities, .d nn+ie <br />m <br />agFee <br />A+hen..ise in ori+inA and-se infer... ENGINEER <br />EER in <br />writing -;wrier to €NEIN€€R's issaing the definitive <br />certificate e#2-i-lbst.antial GempletiOR, €IIGI€€R's <br />B. OWNER shall have the right to exclude <br />CONTRACTOR from the Site after the date of <br />Substantial Completion, but OWNER shall allow CON- <br />TRACTOR reasonable access to complete or correct <br />items on the tentative list. <br />14.05 Partial Utilization <br />A. Use by OWNER at OWNER's option of any <br />substantially completed part of the Work which has <br />specifically been identified in the Contract Documents, <br />or which OWNER, ENGINEER, and CONTRACTOR <br />agree constitutes a separately functioning and usable <br />part of the Work that can be used by OWNER for its <br />intended purpose without significant interference with <br />CONTRACTOR's performance of the remainder of the <br />Work, may be accomplished prior to Substantial Com- <br />pletion of all the Work subject to the following condi- <br />tions. <br />1. OWNER at any time may request <br />CONTRACTOR in writing to permit OWNER to <br />use any such part of the Work which OWNER <br />believes to be ready for its intended use and <br />substantially complete. If CONTRACTOR <br />agrees that such part of the Work is <br />substantially complete, CONTRACTOR will <br />certify to OWNER and ENGINEER that such <br />part of the Work is substantially complete and <br />request ENGINEER to issue a certificate of <br />Substantial Completion for that part of the Work. <br />CONTRACTOR at any time may notify OWNER <br />and ENGINEER in writing that CONTRACTOR <br />considers any such part of the Work ready for its <br />intended use and substantially complete and <br />request ENGINEER to issue a certificate of <br />Substantial Completion for that part of the Work. <br />Within a reasonable time after either such <br />request, OWNER, CONTRACTOR, and <br />ENGINEER shall make an inspection of that <br />part of the Work to determine its status of <br />completion. If ENGINEER does not consider <br />that part of the Work to be substantially com- <br />plete, ENGINEER will notify OWNER and <br />CONTRACTOR in writing giving the reasons <br />therefor. If ENGINEER considers that part of <br />the Work to be substantially complete, the <br />provisions of paragraph 14.04 will apply with <br />respect to certification of Substantial Com- <br />pletion of that part of the Work and the division <br />of responsibility in respect thereof and access <br />thereto. <br />2. No occupancy or separate operation <br />of part of the Work may occur prior to <br />compliance with the requirements of paragraph <br />5.10 regarding property insurance. <br />14.06 Final Inspection <br />A. Upon written notice from CONTRACTOR that <br />the entire Work or an agreed portion thereof is <br />complete, ENGINEER will promptly make a final <br />inspection with OWNER and CONTRACTOR and will <br />notify CONTRACTOR in writing of all particulars in <br />which this inspection reveals that the Work is <br />incomplete or defective. CONTRACTOR shall <br />immediately take such measures as are necessary to <br />complete such Work or remedy such deficiencies. <br />14.07 Final Payment <br />A. Application for Payment <br />1. After CONTRACTOR has, in the <br />opinion of ENGINEER, satisfactorily completed <br />all corrections identified during the final <br />inspection and has delivered, in accordance <br />General Conditions - 00700 - 34 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2022 4th St Culvert Replacement at 90th Ave\1-Admin\Bids\Bid Documents\DIV 0 4 Conditions of the Contract - 20201118.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.