Laserfiche WebLink
Division 1— General Requirements, IRC -2022 <br />SECTION 01024 - FORCE ACCOUNT <br />fimWe7d\i3'"A 1 <br />A. CONTRACTOR shall furnish all labor, materials, equipment and incidentals necessary to <br />perform additional work not covered on the Contract Drawings. The force Account is <br />intended as a contingency for unforeseen work. <br />1.2 PAYMENT <br />A. Lump sum amount for force account work is included in the bid schedule. The value of force <br />account work will be determined in accordance with Article 12 of the General Conditions. <br />+ + END OF SECTION + + <br />Force Account - 01024-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\2022 4th Sl Culvert Replacement at 90th Ave\1-Admin\Bids\Bid Documents\DIV 1 GENERAL REQUIREMENTS - <br />20201118.docx <br />