Laserfiche WebLink
Division 1—General Requirements, IRC -2022 <br />1.7 ADJUSTMENTS OF UTILITY CASTINGS, COVERS AND BOXES <br />A. All existing utility castings, including valve boxes, junction boxes, manholes, pull boxes, <br />inlets and similar structures in the areas of construction that are to remain in service shall <br />be adjusted by the CONTRACTOR to bring them flush with the surface of the finished <br />work. <br />B. The CONTRACTOR shall coordinate the utilities to ensure proper construction <br />sequencing. CONTRACTOR shall make available survey reference markers to the various <br />utility companies. <br />++ END OF SECTION ++ <br />1541-5 <br />s- <br />