My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-085A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-085A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 5:03:42 PM
Creation date
7/2/2021 4:55:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2021
Control Number
2021-085A
Agenda Item Number
8.D.
Entity Name
Florida Site Contracting
Subject
4th Street Culvert Replacement at 90th Avenue,
Project Number
IRC-2022
Bid Number
2021045
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 1—General Requirements, IRC -2022 <br />d. Name and address of similar projects on which product was used, and date <br />of installation. <br />2. For construction methods (if specified): <br />a. Detailed description of proposed method. <br />b. Drawings illustrating method. <br />3. Such other data as the ENGINEER may require to establish that the proposed <br />substitution is equal to the product, manufacturer or method specified. <br />C. In making Request for Substitution, CONTRACTOR represents that: <br />1. CONTRACTOR has investigated proposed substitution, and determined that it is <br />equal to or superior in all respects to the product, manufacturer or method <br />specified. <br />2. CONTRACTOR will provide the same or better guarantees or warranties for <br />proposed substitution as for product, manufacturer, or method specified. <br />3. CONTRACTOR waives all claims for additional costs or extension of time related <br />to a proposed substitution that subsequently may become apparent. <br />D. A proposed substitution will not be accepted if: <br />1. Acceptance will require changes in the design concept or a substantial revision <br />of the Contract Documents. <br />2. It will delay completion of the Work, or the work of other contractors. <br />3. It is indicated or implied on a Shop Drawing and is not accompanied by a formal <br />Request for Substitution from CONTRACTOR. <br />E. If the ENGINEER determines that a proposed substitute is not equal to that specified, <br />furnish the product, manufacturer, or method specified at no additional cost to OWNER. <br />F. Approval of a substitution will not relieve CONTRACTOR from the requirement for <br />submission of Shop Drawings as set forth in the Contract Documents. <br />G. The procedure for review by Engineer will include the following: <br />1. Requests for review of substitute items of material and equipment will not be <br />accepted by Engineer from anyone other than CONTRACTOR. <br />2. Upon receipt of an application for review of a substitution, Engineer will <br />determine whether the review will be more extensive than a normal shop <br />drawing review for the specified item. <br />3. If the substitution will not require a more extensive review, Engineer will proceed <br />with the review without additional cost to CONTRACTOR. <br />4. If the substitution requires a more extensive review, Engineer will proceed with <br />the review only after CONTRACTOR has agreed to reimburse Owner for the <br />review cost. <br />5. Engineer may require CONTRACTOR to furnish at CONTRACTOR's expense <br />additional data about the proposed substitute. <br />Substitutions - 01630-2 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2022 4th St Culvert Replacement at 90th Ave\1-Admin\Bids\Bid Documents\DIV 1 GENERAL REQUIREMENTS - <br />20201118.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.