Laserfiche WebLink
Division 2 - Technical Provisions, IRC -2022 <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 101-1— Mobilization/ Demobilization — Per Lump Sum <br />SECTION 102 - MAINTENANCE OF TRAFFIC <br />The work specified in this item shall conform to Section 102 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction, except as modified herein. <br />A. GENERAL PROVISIONS -DESCRIPTION: The work specified in this Section consists of <br />maintaining traffic within the limits of the project for the duration of the construction period, <br />including any temporary suspensions of the work. It shall include the construction and <br />maintenance of any necessary detour facilities; the providing of necessary facilities for access <br />to residences, businesses, etc., along the project; the furnishing, installing and maintaining <br />of traffic control and safety devices during construction, the control of dust through the use <br />of calcium chloride if necessary, and any other special requirements for safe and expeditious <br />movement of traffic as may be called for on the plans. The term, Maintenance of Traffic, as <br />used herein, shall include all of such facilities, devices and operations as are required for the <br />safety and convenience of the public as well as for minimizing public nuisance; all as specified <br />in this Itemized Section 14 of these provisions and Paragraph 24 in General Conditions <br />Section. <br />B. BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor shall present his <br />Maintenance of Traffic Plan at or before the pre -construction conference. The Maintenance <br />of Traffic Plan shall indicate the type and location of all signs, lights, barricades, striping and <br />barriers to be used for the safe passage of pedestrians and vehicular traffic through the <br />project and for the protection of the workmen. The plan will indicate conditions and setups <br />for each phase of the Contractor's activities. <br />When the project plans include or specify a specific Maintenance of Traffic Plan, alternate <br />proposals will be considered when they are found to be equal to or better than the plan <br />specified. <br />In no case may the Contractor begin work until the Maintenance of Traffic Plan has been <br />approved in writing by the Engineer. Modifications to the Maintenance of Traffic Plan that <br />become necessary shall also be approved in writing. Except in an emergency, no changes to <br />the approved plan will be allowed until approval to change such plan has been received. <br />The cost of all work included in the Maintenance of Traffic Plan shall be included in the pay <br />item for Maintenance of Traffic. <br />The Contractor shall be responsible for performing daily inspections, including weekends and <br />holidays, with some inspections at nighttime, of the installations on the project and replace <br />all equipment and devices not conforming with the approved standards during that <br />Division 2 — Technical Provisions - 01025-3 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\2022 4th St Culvert Replacement at 90th Ave\1-Admin\B1ds\Bid Documents\DIV 2 TECHNICAL PROVISIONS - <br />20201118.docx <br />