My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-085A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-085A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 5:03:42 PM
Creation date
7/2/2021 4:55:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2021
Control Number
2021-085A
Agenda Item Number
8.D.
Entity Name
Florida Site Contracting
Subject
4th Street Culvert Replacement at 90th Avenue,
Project Number
IRC-2022
Bid Number
2021045
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations <br />that may affect cost, progress and performance of the Work. <br />D. Bidder has carefully studied all: (1 j reports of explorations and tests of subsurface conditions <br />at or contiguous to the Site and all drawings of physical conditions in or relating to existing <br />surface or subsurface structures at or contiguous to the Site (except Underground Facilities) <br />which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of <br />the General Conditions; and (2) reports and drawings of a Hazardous Environmental Condition, <br />if any, which have been identified in the Supplementary Conditions as provided in paragraph <br />4.06 of the General Conditions. <br />E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all <br />additional or supplementary examinations, investigations, explorations, tests, studies and data <br />concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the <br />Site which may affect cost, ,progress, or performance of the Work or which relate to any aspect <br />of the means, methods, techniques, sequences, and procedures of construction to be employed <br />by Bidder, including applying the specific means, methods, techniques, sequences, and <br />procedures of construction expressly required by the Bidding Documents to be employed by <br />Bidder, and safety precautions and programs incident thereto. <br />F. Bidder does not consider that any further examinations, investigations, explorations, tests, <br />studies, or data are necessary for the determination of this Bid for performance of the Work at <br />the price(s) bid and within the times and in accordance with the other terms and conditions of <br />the Bidding Documents. <br />G. Bidder is aware of the general nature of work to be performed by OWNER and others at the <br />Site that relates to the Work as indicated in the Bidding Documents. <br />H. Bidder has correlated the information known to Bidder, information and observations <br />obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and <br />all additional examinations, investigations, explorations,, tests, studies, and data with the Bidding <br />Documents. <br />I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution <br />thereof by ENGINEER is acceptable to Bidder. <br />J. The Bidding .Documents are generally sufficient to indicate and convey understanding of all <br />terms and conditions for the performance of the Work for which this Bid is submitted. <br />4.01 Bidder further represents that this Bid is genuine and not made in the interest of or on .behalf <br />of any undisclosed individual or entity and is not submitted in conformity with any agreement or <br />rules of any group, association, organization or corporation; Bidder has not directly or indirectly <br />induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or <br />induced any individual or entity to refrain from bidding; and Bidder has not sought by collusion <br />to obtain for itself any advantage over any other Bidder or over OWNER. <br />[The remainderof page. intentionally left blank] <br />Bid Form REV 04-07 - 00310 - 2 <br />F.Tuaic WorkstENGINEERING DIVISION PROJECTS12022 41h SPCulved Replacement at.90th Ave\1-AdminlBidslBid DocumenlsON 0 2_Bidding Documents - <br />20201118.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.