Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State <br />of Florida organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and Florida Site Contracting <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The project will consist of the replacement of an existing culvert at the intersection of 41 <br />Street and 901 Avenue, in the Indian River Farms Water Control District Sub -Lateral D-4 <br />Canal. The proposed pipe will be a 96" Reinforced Concrete Pipe (RCP) with Rip -Rip <br />Rubble end treatment at the upstream, southerly end of the pipe. Other work will include <br />sheet piling, temporary canal bypass, earthwork, sodding, maintenance of traffic, erosion <br />control and any other incidental work required to complete the project. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: 4T" STREET CULVERT REPLACEMENT AT 90TH AVENUE <br />County Project Number: IRC -2022 <br />Bid Number:02 21045 <br />Project Address: Intersection of 01 Street and 90th Avenue, Vero Beach, <br />Florida 32968 <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative, assume all duties and responsibilities, and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with <br />the completion of the Work in accordance with the Contract Documents. <br />_anal MAE, -;TI 11 <br />4.1 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.2 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />Agreement (Public Works) REV 04-07 0052017 2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\2022 4th St Culvert Replacement at 90th Ave\1-Admin\Bids\Bid Documents\DIV 0_3_Contract Forms 20201118.docx - <br />