My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-085A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-085A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 5:03:42 PM
Creation date
7/2/2021 4:55:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2021
Control Number
2021-085A
Agenda Item Number
8.D.
Entity Name
Florida Site Contracting
Subject
4th Street Culvert Replacement at 90th Avenue,
Project Number
IRC-2022
Bid Number
2021045
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: .20 <br />OWNER: Indian River County <br />CONTRACTOR: <br />CONTRACT FOR: 4T—" STREET CULVERT REPLACEMENT AT 90!-H AVENUE <br />Project No.: IRC -2022 <br />Project Description: The project will consist of the replacement of an existing culvert at <br />the intersection of 4th Street and 90th Avenue, in the Indian River <br />Farms Water Control District Sub -Lateral D-4 Canal. The proposed <br />pipe will be a 96" Reinforced Concrete Pipe (RCP) with Rip -Rip Rubble <br />end treatment at the upstream, southerly end of the pipe. Other work <br />will include sheet piling, temporary canal bypass earthwork <br />sodding, maintenance of traffic, erosion control and any other <br />incidental work required to complete the project. <br />OWNER's Bid No. 2021045 <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To: <br />OWNER <br />And To: <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially <br />complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR <br />to complete all the Work in accordance with the Contract Documents. The items in the tentative <br />list shall be completed or corrected by CONTRACTOR within 30 calendar days of the above date <br />of Substantial Completion. <br />The responsibilities between OWNER and CONTRACTOR for security, operation, safety, <br />Certificate of Substantial Completion REV 04-07 - 00630 - 1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2022 4th St Culvert Replacement at 90th Ave\1-Admin\Bids\13id Documents\DIV 0_3_Contract Forms - 20201118.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.