My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-091
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 9:12:44 AM
Creation date
7/6/2021 9:12:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/22/2021
Control Number
2021-091
Agenda Item Number
12.H.1.
Entity Name
Bowman Consulting Group, Ltd.
Subject
CCNA2018 Work Order 3, Amendment 1, West Wabasso Septic to Sewer Phase 3C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br />We propose to provide the following services: <br />Task 1 - Civil Design Services (Bowman Consulting) <br />System Evaluation and Design <br />1. Prepare report that includes evaluation and determination of gravity sewer build out <br />control grades for each site. Estimate current wastewater flows and - build out <br />wastewater flows for each site. Summarize lift station components that will be required <br />to change between current design and build out for each site. <br />2. Utility Research: contact utility companies and obtain record information and transfer <br />information to design drawings. <br />Prepare Bidding Documents <br />3. Attend and prepare summary meeting notes for up to two (2) meetings, anticipated to be <br />at beginning, and 50% complete milestones of the project. <br />4. Prepare 24" x 36" drawings anticipated to be: <br />Sheet <br />Description <br />G-1 thru 2 <br />To be included with Phase 3A & 313 work <br />SP -1 thru 2 <br />SWPPP Sheets, 2 plan sheets to be included with Phase 3A & 313 <br />PA -1 thru 8 <br />Phase 3C Site: 1 - Overall Site Plan, 3 - 30 scale Plan & Profile <br />5. Multiple site visits and coordination with the residents for identification of design issues. <br />6. Utilize the IRCDUS Utility Construction Standards and supplement with specifications as <br />necessary for the design. <br />7. Provide two (2) engineer's opinion of estimated construction cost and design plans at <br />50% and after 90% design milestone. Final estimate will match bid schedule. <br />8. Field review design/plans at 90% complete milestone to compare with site conditions. <br />In-house plan checking and respond to Utility comments and prepare final drawings and <br />specifications. <br />Task 2 - Permitting Services (Bowman Consulting) <br />Project Permitting <br />9. Prepare and submit FDEP permit the project (both Phases), including fees of $250. <br />Respond to comments and follow through to final clearance. <br />10. Prepare and submit IRC right of way permits for 87th Street and 63rd Avenue. These will <br />be no cost permits. <br />11. SJRWMD no permit required determination. <br />
The URL can be used to link to this page
Your browser does not support the video tag.