Laserfiche WebLink
Division 1—General Requirements, IRC -1764 <br />SECTION 01024 - FORCE ACCOUNT <br />1.1 GENERAL <br />A. CONTRACTOR shall furnish all labor, materials, equipment and incidentals necessary to <br />perform additional work -not covered on the Contract Drawings. The force Account is <br />intended as a contingency for unforeseen work. , <br />1.2 PAYMENT <br />A. Lump sum amount for force account work is included in the bid schedule. The value of force <br />account work will be determined in accordance with Article 12 of the General Conditions. <br />+ + END OF SECTION + + <br />Force Account - 01024-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1764 IRC Courthouse Roof Rep1acement\1-Admin\Bids\Bid DocumentsWaster Bid Documents\DIV 1_GENERAL <br />REQUIREMENTS - 20201002.docx <br />