My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082F
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 10:05:43 AM
Creation date
7/19/2021 2:32:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/08/2021
Control Number
2021-082F
Agenda Item Number
8.V.
Entity Name
Atlantic Roofing II of Vero Beach, Inc.
Subject
Courthouse Roof Replacement
Project Number
IRC-1764
Bid Number
2021036
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY COURTHOUSE PAGE 2 <br />METAL ROOFING REPLACEMENT PROJECT SECTION 024119 <br />JANUARY 15, 2021 SELECTIVE DEMOLITION <br />B. Conditions existing at time of inspection for bidding purpose will be maintained by <br />Owner as far as practical. <br />C. Notify Architect of discrepancies between existing conditions and Drawings before <br />proceeding with selective demolition. <br />1.6 WARRANTY <br />A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or <br />damaged during selective demolition, by methods and with materials so as not to void <br />existing warranties. <br />PART 2 - PRODUCTS <br />2.1 PEFORMANCE REQUIREMENTS <br />A. Regulatory Requirements: Comply with governing EPA notification regulations before <br />beginning selective demolition. Comply with hauling and disposal regulations of <br />authorities having jurisdiction. <br />B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Verify that utilities have been disconnected and capped before starting selective <br />demolition operations. <br />B. Survey existing conditions and correlate with requirements indicated to determine <br />extent of selective demolition required. <br />C. When unanticipated mechanical, electrical, or structural elements that conflict with <br />intended function or design are encountered, investigate and measure the nature and <br />extent of conflict. Promptly submit a written report to Architect. <br />D. Engage a professional engineer to perform an engineering survey of condition of <br />building to determine whether removing any element might result in structural <br />deficiency or unplanned collapse of any portion of structure or adjacent structures <br />during selective building demolition operations. <br />E. Survey of Existing Conditions: Record existing conditions by use of preconstruction <br />photographs or preconstruction videotapes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.