My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082F
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 10:05:43 AM
Creation date
7/19/2021 2:32:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/08/2021
Control Number
2021-082F
Agenda Item Number
8.V.
Entity Name
Atlantic Roofing II of Vero Beach, Inc.
Subject
Courthouse Roof Replacement
Project Number
IRC-1764
Bid Number
2021036
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY COURTHOUSE PAGE 9 <br />METAL ROOFING REPLACEMENT PROJECT SECTION 076200 <br />JANUARY 15, 2021 SHEET METAL AND FLASHINGS <br />1. Provide concealed fasteners where possible, and set units true to line, levels, <br />and slopes. <br />2. Install work with laps, joints, and seams that are permanently watertight and <br />weather resistant. <br />B. Roof Edge Flashing: <br />1. Install roof edge flashings in accordance with ANSI/SPRI/FM 4435/ES-1. <br />2. Anchor to resist uplift and outward forces in accordance with recommendations in <br />cited sheet metal standard unless otherwise indicated. Interlock bottom edge of <br />roof edge flashing with continuous cleat anchored to substrate at staggered 3 - <br />inch (75 -mm) centers. <br />3.5 INSTALLATION TOLERANCES <br />A. Installation Tolerances: Shim and align sheet metal flashing and trim within installed <br />tolerance of 1/4 inch in 20 feet (6 mm in 6 m) on slope and location lines indicated on <br />Drawings and within 1/8 -inch (3 -mm) offset of adjoining faces and of alignment of <br />matching profiles. <br />3.6 CLEANING <br />A. Clean exposed metal surfaces of substances that interfere with uniform oxidation and <br />weathering. <br />B. Clean and neutralize flux materials. Clean off excess solder. <br />C. Clean off excess sealants. <br />3.7 PROTECTION <br />A. Remove temporary protective coverings and strippable films as sheet metal flashing <br />and trim are installed unless otherwise indicated in manufacturer's written installation <br />instructions. <br />B. Replace sheet metal flashing and trim that have been damaged or that have <br />deteriorated beyond successful repair by finish touchup or similar minor repair <br />procedures, as determined by Architect. <br />END OF SECTION 076200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.