My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082F
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 10:05:43 AM
Creation date
7/19/2021 2:32:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/08/2021
Control Number
2021-082F
Agenda Item Number
8.V.
Entity Name
Atlantic Roofing II of Vero Beach, Inc.
Subject
Courthouse Roof Replacement
Project Number
IRC-1764
Bid Number
2021036
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY COURTHOUSE <br />METAL ROOFING REPLACEMENT PROJECT <br />JANUARY 15, 2021 <br />3.2 INSTALLATION <br />PAGE 4 <br />SECTION 079200 <br />JOINT SEALANTS <br />A. Sealant Installation Standard: Comply with recommendations in ASTM C 1193 <br />for use of joint sealants as applicable to materials, applications, and conditions <br />indicated. <br />B. Install sealant backings of kind indicated to support sealants during application <br />and at position required to produce cross-sectional shapes and depths of <br />installed sealants relative to joint widths that allow optimum sealant movement <br />capability. <br />1. Do not leave gaps between ends of sealant backings. <br />2. Do not stretch, twist, puncture, or tear sealant backings. <br />3. Remove absorbent sealant backings that have become wet before <br />sealant application and replace them with dry materials. <br />C. Install bond -breaker tape behind sealants where sealant backings are not used <br />between sealants and backs of joints. <br />D. Install sealants using proven techniques that comply with the following and at <br />the same time backings are installed: <br />1. Place sealants so they directly contact and fully wet joint substrates. <br />2. Completely fill recesses in each joint configuration. <br />3. Produce uniform, cross-sectional shapes and depths relative to joint <br />widths that allow optimum sealant movement capability. <br />E. Tooling of Nonsag Sealants: Immediately after sealant application and before <br />skinning or curing begins, tool sealants according to requirements specified in <br />subparagraphs below to form smooth, uniform beads of configuration indicated; <br />to eliminate air pockets; and to ensure contact and adhesion of sealant with <br />sides of joint. <br />1. Remove excess sealant from surfaces adjacent to joints. <br />2. Use tooling agents that are approved in writing by sealant manufacturer <br />and that do not discolor sealants or adjacent surfaces. <br />3. Provide concave joint profile per Figure 8A in ASTM C 1193, unless <br />otherwise indicated. <br />F. Clean off excess sealant or sealant smears adjacent to joints as the Work <br />progresses by methods and with cleaning materials approved in writing by <br />manufacturers of joint sealants and of products in which joints occur. <br />3.3 FIELD QUALITY CONTROL <br />A. Field -Adhesion Testing: Field test joint -sealant adhesion to joint substrates as <br />follows: <br />Extent of Testing: Test completed and cured sealant joints as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.