My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-082F
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-082F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 10:05:43 AM
Creation date
7/19/2021 2:32:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/08/2021
Control Number
2021-082F
Agenda Item Number
8.V.
Entity Name
Atlantic Roofing II of Vero Beach, Inc.
Subject
Courthouse Roof Replacement
Project Number
IRC-1764
Bid Number
2021036
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY BUILDING DEPARTMENT <br />ax <br />D <br />Re -Roof Permit Checklist <br />The following items are required with submission of your re -roof permit application. <br />• 2 copies of completed Re -Roof permit application <br />• Roof Pressure Sheet completed as applicable <br />• Copy of signed contract with contractor or Owner/Builder Disclosure Statement <br />• Florida Product Approvals or Miami -Dade NOA's. All product approval numbers must be <br />provided on the application along with a copy at the time of application and provided <br />on-site for inspection. Materials and methods used for recovering or replacing an <br />existing roof covering must comply with Ch -15 of FBC, Ch -9 of FBC Residential, Ch -7 of <br />FBC Existing Building and all manufacturer's product installation instructions. <br />• If current roof covering is a lightweight system (shingle/metal/etc.) and roof covering is <br />changing to a heavy system (tile), a Florida Licensed Design Professional must provide <br />structural member/system verification for items such as wood or metal trusses, rafters, <br />joists, etc. to ensure existing structural system is adequate for increased load. <br />• Recorded Notice of Commencement (NOC) required to be submitted prior to first <br />Inspection if job value is greater than $2500.00. <br />• Commercial Roofs require a roof plan stating wind design criteria and components and <br />cladding pressures, location and size for applicable zones prepared by a Florida <br />Licensed Engineer in addition to the Roof Plan requirements for One & Two Family <br />Dwellings. <br />• A Florida Licensed Engineer may need to extrapolate the attachment requirements of <br />the Product Approval or Miami -Dade NOA to meet the components and cladding <br />pressures of the roof or calculate the moment connection for a the roof. <br />• Required Mechanical Equipment stands or curbs (FBCEB 301.5, FBCB 1510.10), guards <br />and access guards (FBCM 304.11, FBCB 1011.13), roof access ladder and ladder <br />extension (FBCM 306.5) will need to be brought into compliance with current codes <br />prior to the roof receiving a final inspection. <br />• Resources for Applications/Forms and Product Approvals <br />https://floridabuilding.org/pr/pr default.aspx <br />http://irccdd.com/Applications/Building Division.htm <br />http:flwww.miamidade.gov/buildinq/pc-search app asp <br />Illustrations: <br />https://www.fema.gov/sites/defau it/files/2020-07/best-practices-minimize-wind- <br />water hurricane-michael-florida.pdf or www.floridabuilding.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.