Laserfiche WebLink
IRC-2025—ITB—FLEET FACILITY GAS ISLAND CANOPY REFURBISHMENT <br />Technical Specifications <br />Scope <br />FURNISH MATERIAL, LABOR, AND EQUIPMENT TO REFURBISH THE FLEET <br />FACILITY FUEL ISLAND CANOPY TO NEW CONDITION AS FOLLOWS: <br />1. Replace 140LF of prefinished white aluminum fascia panels and check/re-secure 276LF of existing fascia <br />panels. <br />2. Clean & reseal 532 LF of canopy gutters. <br />3. Remove, repair, and re -install twelve (12) canopy drains. <br />4. Replace 12 column trim kits. <br />5. Replace twenty-six (26) rusted 3" x 16" x 43' white ceiling panels. <br />6. Prep, prime, and paint twelve (12) canopy columns with Sherwin Williams Kern Kromik primer and finish in <br />Sherwin Williams Sher-Cyrl top coat white. <br />7. Prep, prime, and paint 732 LF of island curbs with Sherwin Williams Pro -Park safety yellow. <br />8. Prep, prime, and paint thirty-six (36) bollards with Sherwin Williams Pro -Park safety yellow. <br />9. Prep and prime upper structural steel with one coat of Sherwin Williams Pro-Cyrl primer in red oxide. <br />10. Prep, prime, and paint 10,810 SF of canopy deck with Sherwin Williams Kern Kromik primer and finish in <br />Sherwin Williams Sher-Cyrl top coat white. <br />11. Prep, prime, paint 416 LF of canopy fascia with Sherwin Williams Kern Kromik primer and finish in Sherwin <br />Williams Sher-Cyrl top coat white. <br />12. Install four (4) scuppers to relieve water at center gutters. <br />13. Replace an approximate 1000 additional deck clips to reinforce existing deck panels. (old clips are rusting <br />off) <br />14. Inspect, repair, replace light fixtures, bulbs as needed. <br />Contractor will be responsible for any permit fees — Building Division schedule of fees included with package. <br />Each bidder must be an actively registered Contractor in the State of Florida and be registered with the Indian River <br />County Building Division. <br />Regular working hours are defined as Monday through Friday, excluding Indian River County Holidays, <br />from 7 a.m. to 5 p.m. All costs of inspection and testing performed during overtime work by the <br />CONTRACTOR, which is allowed solely for the convenience of the CONTRACTOR, shall be borne by the <br />CONTRACTOR. <br />End of Technical Specifications <br />Page 12 of 39 <br />