My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-085D
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-085D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 3:09:40 PM
Creation date
7/19/2021 3:06:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2021
Control Number
2021-085D
Agenda Item Number
8.E.
Entity Name
JSR Enterprises East Coast, LLC.
dba JSR Fueling Technologies, LLC
Subject
Fleet Facility Fuel Island Canopy Refurbishment
Project Number
IRC-2025
Bid Number
2021024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and JSR Enterprises East <br />Coast, LLC d/b/a JSR Fueling Technologies, LLC <br />(hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally <br />described as follows: <br />FURNISH MATERIAL, LABOR, AND EQUIPMENT TO REFURBISH THE <br />FLEET FACILITY FUEL ISLAND CANOPY TO NEW CONDITION AS FOLLOWS: <br />1. Replace 140LF of prefinished white aluminum fascia panels and check/re-secure 276LF of existing fascia <br />panels. <br />2. Clean & reseal 532 LF of canopy gutters. <br />3. Remove, repair, and re -install twelve (12) canopy drains. <br />4. Replace 12 column trim kits. <br />5. Replace twenty-six (26) rusted 3" x 16" x 43' white ceiling panels. <br />6. Prep, prime, and paint twelve (12) canopy columns with Sherwin Williams Kern Kromik primer and finish <br />in Sherwin Williams Sher-Cyrl top coat white. <br />7. Prep, prime, and paint 732 LF of island curbs with Sherwin Williams Pro -Park safety yellow. <br />8. Prep, prime, and paint thirty-six (36) bollards with Sherwin Williams Pro -Park safety yellow. <br />9. Prep and prime upper structural steel with one coat of Sherwin Williams Pro-Cyrl primer in red oxide. <br />10. Prep, prime, and paint 10,810 SF of canopy deck with Sherwin Williams Kern Kromik primer and finish in <br />Sherwin Williams Sher-Cyrl top coat white. <br />11. Prep, prime, paint 416 LF of canopy fascia with Sherwin Williams Kern Kromik primer and finish in <br />Sherwin Williams Sher-Cyrl top coat white. <br />12. Install four (4) scuppers to relieve water at center gutters. <br />13. Replace an approximate 1000 additional deck clips to reinforce existing deck panels. (old clips are <br />rusting off) <br />14. Inspect, repair, replace light fixtures, bulbs as needed. <br />ARTICLE 2 - THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name: FLEET FUEL ISLAND CANOPY REFURBISHMENT <br />Bid Number: 2021024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.