My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-092
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 11:26:43 AM
Creation date
7/19/2021 3:19:16 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/06/2021
Control Number
2021-092
Agenda Item Number
8.C.
Entity Name
MBV Engineering, Inc.
Subject
Work Order 21, For Design of Go-Line Bus Stop Shelters
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Permitting <br />The Consultant will prepare application packages and submit to the below listed agencies for <br />each bus stop location. Consultant will respond to Building Department review comments and <br />re -submit plans to address comments, as necessary. It should be noted the project contractor <br />will be responsible for obtaining the building permit and payment of building permit fees for <br />each location. <br />Indian River County and City of Vero Beach — Bus Stop Locations: <br />• Indian River County Building Permit <br />City of Fellsmere - Location: <br />• City of Fellsmere Building Department <br />City of Sebastian - Bus Stop Locations: <br />• City of Sebastian Building Department <br />Task 4: Cost Estimates <br />The Consultant will prepare an Engineer's Opinion of Probable Costs at approximately 50 and 100 <br />percent levels of design completion. <br />Task 5: Construction Services <br />The Consultant shall attend (1) Pre -Construction meeting at COUNTY with staff and the selected <br />contractor, and provide the following scope of services during the construction phase at each Bus Stop <br />Location: <br />A. Civil Construction Services <br />• Shop drawings review of civil site components <br />• One (1) inspection during subbase construction <br />• One (1) inspection during sidewalk formboards <br />• One (1) inspection for punchlist prior to final inspection <br />• One (1) site visit for final walkthrough with COUNTY inspector in attendance <br />• Review of testing reports and as-builts provided by Contractor <br />• Coordination with COUNTY Planning and Public Works inspection staff <br />• Coordination with Contractor <br />• Certification by E.O.R. to COUNTY <br />B. Structural Construction Services <br />• Shop drawings review of structural foundation components <br />• One (1) inspection prior to installation of concrete for foundations <br />• Review of testing reports and as-builts provided by Contractor <br />• Coordination with COUNTY Planning and Public Works inspection staff <br />• Coordination with Contractor <br />
The URL can be used to link to this page
Your browser does not support the video tag.