My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/18/2021
CBCC
>
Meetings
>
2020's
>
2021
>
05/18/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2021 10:57:54 AM
Creation date
8/2/2021 10:45:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/18/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Per the Continuing Consulting Engineering Services Agreement for professional engineering services dated <br />April 17, 2018, extended and amended on May 18, 2021, Atkins has submitted a proposal for Work Order <br />#4 Phase 1 with the total negotiated cost for the professional services in a sum amount of $68,562.00. <br />The negotiated cost has been broken into different tasks including project management, structural survey <br />work, and a technical memorandum to include options for addressing the issues that are identified in <br />Work Order #4 Phase.1 and assisting the County in determining the preferred alternative. Also included <br />in the technical memorandum will be an estimated cost for structural repairs. <br />Funding: <br />Funds for this project are derived from the renewal and replacement budget in the Utilities operating <br />fund. Utilities operating funds are generated from water and sewer revenues. <br />.Description <br />Account Number <br />Amount <br />�_WWWTF Oxidation Ditch & Walkway <br />47121836-044699-21540 <br />$68,562 <br />Recommendation: <br />Staff recommends that the Board of County Commissioners approve Work Order #4 with Atkins, in the <br />amount of $68,562.00, for professional services that include evaluation of the current structural integrity <br />of the overall oxidation ditch structure and associated bridges at the West Regional Wastewater <br />Treatment Facility, and authorize the Chairman to execute said work order on their behalf. <br />Attachments: <br />Work Order #4: West Regional Wastewater Treatment Plant Oxidation Ditch and Bridge <br />Structural Improvements Phase 1 <br />F:\Utilities\UTILITY- EMPLOYEE FOLDERS\Richard Meckes\Purchasing\Agenda -Atkins Structural Improvements Phase 1 West WWTP v2.docx <br />112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.