My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/18/2021
CBCC
>
Meetings
>
2020's
>
2021
>
05/18/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2021 10:57:54 AM
Creation date
8/2/2021 10:45:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/18/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />MARLIN ENGINEERING, INC. LOADED HOURLY RATES <br />Indian River County <br />- Continuing Consulting Engineering Services Roadway, Traffic & Transportation Enginee <br />RATES ARE EFFECTIVE MAY 18, 2021 THROUGH APRIL 16, 2023 <br />CLASSIFICATION Loaded Labor Rate (per hour) <br />Principal <br />$220.00 <br />Project Manager <br />$198.00 <br />Chief Engineer <br />$192.50 <br />Chief Planner <br />$192.50 <br />Senior Roadway Engineer <br />$176.00 <br />Senior Traffic Engineer <br />$176.00 <br />Senior Structural Engineer <br />$176.00 <br />Senior Planner <br />$143.00 <br />Project Engineer <br />$143.00 <br />Traffic Engineer <br />$121.00 <br />Senior Designer <br />$121.00 <br />Engineering Intern <br />$110.00 <br />Designer <br />$110.00 <br />Planner <br />$110.00 <br />GIS Technician <br />$99.00 <br />CADD Technician <br />$99.00 <br />Senior Engineering Technician <br />$93.50 <br />Engineering Technician <br />$82.50 <br />Construction Inspector <br />$110.00 <br />Senior Inspector <br />$110.00 <br />Utility Coordinator <br />$110.00 <br />Senior Surveyor & Mapper <br />$181.50 <br />Surveyor <br />$121.00 <br />Survey Technician <br />$93.50 <br />2 -Man Survey Crew (8 -Hour Day) <br />$1,156.10 <br />3 -Man Survey Crew (8 -Hour Day) <br />$1,449.80 <br />4 -Man Survey Crew (8 -Hour Day) <br />$1,742.40 <br />Clerical <br />$ 55.00 <br />SUBCONSULTANTS LOADED LABOR RATES <br />GCME, Inc. <br />Classification <br />Loaded Labor Rate (per hour) <br />Principal Engineer <br />$247.50 <br />Senior Engineer <br />$214.50 <br />Project Engineer <br />$152.30 <br />Engineer <br />$103.13 <br />Engineering Technician <br />$85.80 <br />91 <br />1of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.