My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-092B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-092B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2021 12:08:37 PM
Creation date
8/2/2021 11:53:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/06/2021
Control Number
2021-092B
Agenda Item Number
8.J.
Entity Name
Masteller & Moler, Inc.
Subject
Amendment No. 2 to Work Order No. 7, 8th Street Utility Relocation
FDOT Project 437717-1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M) MASTELLER & MO <br />INC. <br />1655 27" <br />Ste. 2, Vero Beach, FL 32960 <br />M-1 — CIVIL ENGINEERS — (772) 567-5300 <br />AMENDMENT NUMBER 2 CCNA2018 WORK ORDER NUMBER 7 <br />437717 8TH STREET 24" FM RELOCATION <br />EXHIBIT A <br />GENERAL INFORMATION <br />The purpose of this Amendment Number 2 to Work Order Number 7 is to authorize Masteller & Moler, <br />Inc. to provide additional design, permitting and bid document revision services to relocate the existing <br />8" water main and associated valves along 8th Street between 74th Avenue and the service road located <br />approximately 375 lineal feet east of E. Polo Grounds Drive from the south side of the road to the north <br />side of the road. <br />A brief description of the scope of services and deliverables for this Amendment 2 is provided as follows: <br />SCOPE OF SERVICES <br />Task A — Supplemental Topographic Survey <br />Consultant shall use the services of their survey subconsultant, Masteller, Moler & Taylor, Inc., to provide <br />supplemental topographic and route survey information for the proposed 1,300± lineal feet 8" potable <br />water main replacement. This additional survey information will supplement the existing topographic <br />survey provided by the Florida Department of Transportation for the 8th Street Bridge Replacement <br />project, and will be added to the existing survey information. Consultant shall use the supplemental <br />topographic survey information and existing survey information as the base plans for this 8th Street Utility <br />Replacement Project. <br />Task B — Engineering Design & Preparation / Revision of Construction Plans <br />Consultant shall use the existing force main Base Plans and supplement survey information for design and <br />preparation of Construction Plans to include a new 8" PVC potable water main, including water valve <br />relocation, along the north side of 8th Street. Consultant shall revise the latest set of 24" Force Main <br />Relocation plans and specifications to include the addition of the 8" potable water main relocation, which <br />shall consist of requirements for connection of the new utilities to existing systems to remain. Plans and <br />specifications will also include the requirements for abandonment of portions of the potable water system <br />replaced by new main, and demolition of certain existing fixtures. We shall continue to coordinate with <br />the FDOT as needed to ensure the Roadway Improvements and related Stormwater Improvements and <br />the Utility Relocation Plans are not in conflict. <br />Consultant will incorporate the water main relocation/abandonment into the Bid Documents to be <br />prepared under Work Order #7, Task F — Bidding Services and Specifications. <br />Task C — Permitting <br />We shall secure permits for the proposed work from the following agencies: <br />• Indian River County Public Works Right -of -Way (ROW) Utilities; <br />• FDEP Water General Permit <br />Exhibit "A" - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.