Laserfiche WebLink
HAYES <br />Construction <br />Group <br />PROPOSAL <br />March 26, 2021 <br />Mr. Jeffery Ripple <br />Indian River County Sheriff Department <br />Corrections Department <br />4055 41" Ave . <br />Vero Beach, FL 32966 <br />RE: Kitchen Floor Replacement <br />We are pleased to present you with the following proposal for the renovation of the building <br />located at the above address:. <br />SCOPE OF WORK. <br />Flooring <br />• Prepare existing floors to receive new flooring one section at a time <br />• Apply a two part epoxy flooring with non-skid aggregate <br />• Flooring to.wall transition will be 6" <br />• Epoxy to be a high traffic product <br />• Flooring alternate will be. an applied flooring such as vinyl <br />• Any modification to floor outlet, plumbing etc. is NOT included <br />• An exact plan of progression is to be approved by the IRCSO <br />• All materials to be approved prior to commencement of work <br />• Floor preparation is contingent on acceptable substrate <br />NOTE: **All pricing is subject to change once final design and specifications are provide** <br />* *Additional work not specifically described above will be an additional cost. Any unforeseen <br />conditions found will be documented, priced out and sent to the client. The client will be <br />required to give approval for the additional cost of work before the work will resume. In some <br />cases it will not be possible to provide pricing for unforeseen conditions, in those cases the work <br />will be done on a COST PL US basis using the rates below. <br />Superintendent $60.00 per hour <br />General Services $45.00 per hour <br />Painting <br />• Drywall <br />• Door Repair (not new install) <br />• Demolition <br />Carpenter $55.00 per hour <br />Laborer $35.00 per hour <br />Contractors Fee 20% on Invoices <br />- Elevated Results - <br />P.O. +Box 1114 1 New Beach, FL 32961 1 772.226.0061 1 brian@hayesgroupinc.com <br />13 <br />