My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/20/2021 (4)
CBCC
>
Meetings
>
2020's
>
2021
>
04/20/2021 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2021 2:02:36 PM
Creation date
8/16/2021 11:36:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/20/2121
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
576
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will attend up to three (2) progress meetings on-site. <br />Consultant will assist the Owner with closeout documentation review prior to <br />completion of the project. <br />TASK 4 - PROGRAMMING AND INTEGRATION <br />Consultant will review and completely vet the current HMI migration to <br />VTScada, test and verify operations local and with all external systems. Checkout <br />and update of all PLC to HMI interfaces including scaling and troubleshooting <br />all points will be performed to establish a baseline completed migration. <br />Contractor will design/ Install New HSP PLC Control panel, relocate all I/O <br />from existing main PLC, test, verify and Consultant will program the new PLC <br />and get working directly with VTScada HMI. <br />Consultant will modify Main PLC Panel to remove the right most PLC5, A/B <br />switch interconnecting wiring to make PLC5A a stand-alone PLC and install a <br />new ControlLogix PLC rack with two EN2T modules, CLX, and a network <br />switch provided by the contractor. <br />SCHEDULE <br />In general, the following schedule is anticipated and consultant will work as <br />expeditiously as possible to meet it: <br />Task 1: 2 weeks after NTP issuance <br />Task 2: 2 months (based on IRC procurement schedule) <br />Task 3: 5 months after Contractor awarded project <br />Task 4: To occur concurrent to Task 3 <br />ADDITIONAL SERVICES <br />The following services are not included in the Scope of Services for this project, <br />but may be required depending on circumstances that may arise during the <br />execution of this project. Additional services include, but may not be limited to <br />the following: <br />• Purchase/ installation of PLC hardware, panels, electrical components, etc. <br />93 <br />K:\WPB_Civil\General\Black\Florida\IRCU\Oslo - PLC Part A\20210325 - Scope - Oslo PLC Part A Scope.docx Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.