Laserfiche WebLink
EXHIBIT A <br />INDIAN RIVER COUNTY <br />CDBG-HR <br />HOUSING ASSISTANCE PLAN <br />(EXCERPT: PAGES 38-40) <br />H. Bidding <br />Bidding of potential CDBG and DRI units is conducted by the HRS in conjunction with the County <br />Procurement/Purchasing Department. Applicants review the pre -approved list of eligible contractors before their cases <br />are sent out for bids. Applicants have the right to remove any contractor(s) from the list of prospective bidders for their <br />unit, as long as the removal request is based on non-discriminatory, non -bias, or other non -subjective reasoning and <br />at least three (3) eligible contractors are allowed to bid. The Applicant must be willing to justify the removal of <br />contractor(s) from the bidding list. Applicants may also request additional contractors as bidders. If these Applicant - <br />requested contractors submit the Contractor Application and are approved by the PA and are otherwise eligible, they <br />may be added to the bidders list and bid on the housing rehabilitation work. The HRS will make maximum effort to <br />ensure participation by minority and/or Section 3 owned contracting firms. Under CDBG and DRI, the HRS shall qualify <br />and recommend all contractors and other necessary vendors (lead based paint, asbestos, title search, mold, appraisal, <br />land survey, environmental, etc.) for work the HRS recommends or the program requires on eligible units. In these <br />cases, the County policies shall govern the qualifying and award process, including this HAP. <br />No housing unit owner, occupant, or immediate relative of the same, eitherpersonally or corporately, shall serve as a <br />contractor or sub -contractor to be paid with CDBG funds for the rehabilitation of said building, nor shall they be paid for <br />their own labor with CDBG funds for the rehabilitation of said building. <br />A notice is sent via email, fax or U.S. Mail to each eligible bidder to inform them of the job. Bidding notices will be <br />posted at primary governmental buildings to the maximum practical extent. Advertising for individual jobs will be <br />conducted as necessary but will not exempt contractors form the requirement that they must be pre -qualified. <br />1. Notification to Bidders (NTB): The HRS or assigned Housing Staff will notify previous program approved Contractors <br />of the availability of the work order and establish a date for the pre-bid conference and bid submission deadline. Bids <br />are opened in the public at the designated time and bid tabulation is prepared. <br />2. Pre -Construction Meeting: An onsite meeting will be arranged between the homeowner, the approved Contractors <br />and the HRS to review the scope of work and site considerations. This meeting will also serve to allow for Contractor <br />and homeowner introductions and questions. Any questions that arise from the onsite meeting must be submitted in <br />writing to the HRS who is required to answer the question in writing and submit it to all approved present Contractors. <br />Questions may not be answered less than seventy-two (72) hours prior to the established bid submission date. Each <br />contractor MUST attend this pre-bid conference held at the approved unit to be rehabilitated or inspect the house under <br />the Applicant's supervision. Failure to do so will result in automatic rejection of his/her bid(s) for the unit(s). <br />3. Bid Submission and Award Recommendations: Bids will be submitted on the date and time established in the <br />Notification to Bidders advertisement and awarded in compliance with the HAP requirements and the terms set forth in <br />the NTB advertisements. Sealed bids will be opened at a public bid opening. The HRS will generally recommend that <br />the contract be awarded to the lowest responsible bidder within plus or minus fifteen percent (15 %) of the cost estimate. <br />Bidding procedures will adhere to County purchasing policy. Bids below the fifteen percent (15%) threshold will be <br />reviewed and are not automatically disqualified. <br />minus ten percent (10%) contingency will be assessed for all Section 3 and/or W/MBE firms at the bid opening to <br />ovide incentive, opportunity and encourage the participation of such established business types in accordance withiHrJD requirements. All bid awards will be made available to the participating Contractors and homeowners j----- <br />IThe PA reserves the right to_reject any and all bids and to award in the best interest of the Applicant,and <br />ffhe Applicant must approve the bid award prior to signing contracts. <br />,No_contracto� wwill-be aallowed-to have more than-two(2) fobs per bid round) , with a maximum award of three (3) jobs <br />under construction at one time without consent of the PA unless: <br />a. The anticipated date of commencement is after the scheduled and estimated date of completion of current jobs; or <br />b. The contractor has demonstrated, through past performance, his/her ability to satisfactorily complete multiple <br />contracts in a timely manner thereby causing no impact on project and program completions. <br />This rule may be waived by the County Commission if it is determined that there is an inadequate pool of qualified <br />bidders, if the other bids are excessive, or if other extenuating circumstances arise. <br />27 <br />Attachment 2 <br />