My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/20/2021 (4)
CBCC
>
Meetings
>
2020's
>
2021
>
04/20/2021 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2021 2:02:36 PM
Creation date
8/16/2021 11:36:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/20/2121
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
576
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.® <br />INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Jason. E. Brown, County Administrator <br />THROUGH: Richard B. Szpyrka P.E., Public Works Director <br />FROM: Keith McCully, P.E., Stormwater Engineer AV <br />SUBJECT: Approval of Work Order No. AACE-1 With Andersen Andre Consulting Engineers, Inc. for <br />Construction Testing Services for Moorhen Marsh Low Energy Aquatic Plant System <br />DATE: April 9, 2021 <br />DESCRIPTION AND CONDITIONS <br />Bids for construction of Moorhen Marsh Low Energy Aquatic Plant System, a regional stormwater <br />treatment facility that will use managed aquatic plants to remove nitrogen and phosphorus from <br />North Relief Canal water, were received July 14, 2020 and bid prices were significantly higher than <br />anticipated. Consequently, on August 18, 2020, the Board of County Commissioners voted to reject all <br />bids and directed staff to design a more basic managed aquatic plant treatment facility that will result in <br />lower construction costs. Design and permitting phases are complete and the project has been <br />advertised for construction bids, which are due May 4, 2021. <br />Construction testing services are necessary during the facility's construction and Work Order AACE-1 <br />addresses these issues. Andersen Andre Consulting Engineers, Inc. performed geotechnical <br />investigations for design and is very familiar with the site and the Project. The firm has a continuing <br />contract with Public Works Department for professional geotechnical engineering and construction <br />testing/inspection services. Specific services are listed on the attached Work Order. <br />The lump sum professional services fee associated with Work Order No. AACE-1 is $80,505.00. <br />FUNDING <br />Funding is available from Optional Sales Tax/Public Works/CIP-Moorhen Marsh -PC North, Acct <br />#31524338-066510-16018. <br />Funding Source Amount <br />Optional Sales Tax/Public Works/CIP-Moorhen Marsh -PC North, Acct <br />#31524338-066510-16018 <br />$80,505.00 <br />RECOMMENDATION <br />Staff recommends the Board of County Commissioners approve Work Order No. AACE-1 in the amount <br />of $80,505.00, and authorize the Chairman to execute it on behalf of the County. <br />ATTACHMENTS <br />Work Order No. AACE-1 <br />Exhibit A — Andersen Andre <br />APPROVED AGENDA ITEM FOR April 20, 2021 <br />56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.