My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/15/2021
CBCC
>
Meetings
>
2020's
>
2021
>
06/15/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2021 2:01:46 PM
Creation date
8/26/2021 1:57:21 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/15/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consent Item <br />Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />Date: June 10, 2021 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, P.E., Director of Utility Services <br />Prepared By: John M. Boyer, P.E., Utilities Engineer <br />Subject:. Amendment 1 to Work Order No. 10 for Masteller & Moler, Inc., <br />North County Water and Sewer Project Phase 2 —Additional Design Services <br />Background: <br />Indian River County Department of Utility Services (IRCDUS) is preparing to move into the construction phase <br />of the North County Phase 2 Water and Sewer project. Staff is seeking additional design services related to <br />the customer -side water and sewer lines, which were not previously included for the project. Staff <br />proposes to amend Work Order 10 for Masteller & Moler, Inc. (MM) to include the additional work. <br />Analysis: <br />On May 18, 2021, the Board of County Commissioners (BCC) approved the renewal and Amendment No. <br />1 to the Continuing Contract Agreement for Professional Services with MM. In accordance with that <br />agreement, MM, which provided design, permitting, and bidding services to the project for lines that are <br />to be installed in the County right-of-way. The subject agenda deals specifically with professional services <br />to investigate and design the customer -side water and sewer service lines as described in Amendment 1 <br />to Work Order #10, attached. <br />The BCC approved Work Order No. 10 with MM on May 18, 2021 for the amount of $184,545.00. This <br />Amendment No. 1 will increase Work Order No. 10 by $159,885.00 to a total of $344,430.00. <br />Funding: <br />There are various funding sources for this project. Staff has secured cost share grants from Saint Johns <br />River Water Management District (SJRWMD) and the Indian River Lagoon National Estuary Program <br />(IRLNEP) as well as a Florida Department of Environmental Protection (FDEP) Water. Quality Restoration <br />grant. Any shortfalls. after exhausting the grants will come from Optional Sales Tax. <br />PageiglL�fI <br />F:\Utilities\UTILITY - Engineering\Projects - Utility Construction Permits\IRC - North Sebastian S2S (M&M)\Agenda Items\Phase II\21-0603 MM <br />WO #10 Add 01\13CC Agenda Item MM WO 10 Add0l.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.