Laserfiche WebLink
PROJECT DATA <br />Project Volue $5.7 Million <br />m. Date Completed S:eot 30, 2018 <br />CONTACT <br />n Jason; Shepler, f'.E:. <br />SeniorProieet Director <br />a 904:644.0644 <br />.i ishepler@►nittouer:com <br />t <br />4 <br />i <br />t <br />i <br />•i <br />i <br />t <br />i <br />t <br />t <br />I <br />j <br />WRF IMPROVEMENTS PHASE it <br />KEYCOlONY 8EACH, FLORIDA PROJECT 161601 <br />{ S <br />The Project, consists of demolition of'the existing nne screening system <br />and structure; removal.6f, the three existing centrifugal blowers; <br />improvements to;existing 0.34 MGD membrone bioreactor water i <br />ceclamoiion facility including one 104661, static screen vvith 2 mm 3 <br />screening unit, one emergency back-up alurninum;bor rock;with. <br />screenings;.one 98,0Madllon anaerobic to,nkj.,one.225,000 ; <br />giailon Surge Anoxic Mixing tank; three 1;200 gpm vertical non- <br />clog pumps;and.new MCC- two.2. s6m .Hybrid Blovvers for SAM <br />let nixing system; four 650 scfm Hybrid Blowers:for MB,R Scour and <br />aeration two 200 gpm wasting pumps from anaerobic'basin;to <br />igester;'removof and replacement of existing eight MBR cossettes; <br />Alum and ivlicroC`.Chemical Feed,Sysiems; existing aerobic digester <br />modificotionsfrom'diffused air to 15.HP.flo6ting aspirator With' two <br />200.gprri BiosoI d Transfer'Pumps,:and'.assodaied HVAC, electrical' <br />and instrumentation improvements. i <br />is <br />1 <br />Jeff Hail Electric Orl.eans;lN. Eleciricol <br />