Laserfiche WebLink
© 2021 CDM Smith <br />All Rights Reserved <br />Indian River County <br />Solid Wast Disposal District <br />Segment 3 Cell 1 Landfill Gas System Expansion <br />Schedule of Bid Items Change Order No. i <br />SCS FIELD SERVICES with Alternate Bid Item Included. <br />Item (Note 1) <br />Unit <br />Estimated <br />Quantity <br />(Notes 6,7) <br />Unit Price <br />Total <br />810 ITEMS: <br />App Date <br />1. SEGMENT 3 CELL 1 LANDFILL GAS SYSTEM EXPANSION <br />Through <br />IA. Site Work <br />a. Site Preparation <br />L.S. <br />1 <br />$2,600 <br />$2,600 <br />b. Landfill Gas Collection Piping Installation (Note 3) <br />bA. 24 -inch SDR 17 HDPE Solid Pipe and Fittings <br />L.F. <br />170 <br />$135 <br />$22,950 <br />b.2.18 -Inch SDR 17 HDPE Solid Pipe and Fittings <br />LF. <br />930 <br />$78 <br />$72,540 <br />b.3.12 -Inch SDR 17 HDPE Solid Pipe and Fittings <br />L.F. <br />520 <br />$45 <br />$23,400 <br />b.4.8 -inch SDR 17 HDPE Solid Pipe and Fittings <br />L.F. <br />170 <br />$38 <br />$6,460 <br />bS. 6 -inch SDR 17 HDPE Solid Pipe and Fittings <br />L.F. <br />1,900 <br />$33 <br />$62,700 <br />b.6.4 -inch SDR 17 HDPE Solid Pipe and Fittings <br />L.F. <br />320 <br />$30 <br />$9,600 <br />c. Vertical Extraction Well (Note 4) <br />V.F. <br />1,050 <br />$123 <br />$129,150 <br />d. Sideslope Collector <br />d.l. Sideslope collector 40 mil textured HDPE geomembrane <br />S.F. <br />12,000 <br />$0.68 <br />$8,160 <br />d.2. Sideslope collector 6 -inch SOR 11 HDPE solid pipe and <br />fittings in rock Note 5 <br />L.F. <br />200 <br />$71 <br />$14,200 <br />d.3. Sideslope collector 64nch SDR 11 HDPE solid pipe and <br />fittings in common fill (Note 5) <br />LF. <br />3,000 <br />$14 <br />$42,000 <br />dA. Sideslope collector 6 -inch SDR 11 HDPE perforated pipe <br />and fittings In rock Note 5 <br />LF. <br />3,000 <br />$67 <br />$201,000 <br />e. Landfill Gas Appurtenances and Fittings <br />e.l. Well Head <br />Ea. <br />38 <br />$950 <br />$36,100 <br />e.2. Miscellaneous Valves and Fittings <br />L.S. <br />1 <br />$45,200 <br />$4S,200 <br />e.3. Access Riser with Femee Blind Flange Cap <br />Ea. <br />12 <br />$1,200 <br />$14,400 <br />eA. Zone Valve <br />Ea. <br />6 <br />$9,200 <br />$SS,200 <br />f. Compressed Air and Force Main Piping, Fittings, Valves, and <br />Ancillary Components <br />IA. 2 -inch SDR 11 HDPE Compressed Air & Condensate Force <br />Main Pipe (same trench as LFG pipe) (Note 3) <br />Lf. <br />3,400 <br />$9 <br />$30,600 <br />f.2. 2 -Inch Compressed Air and Force Main Valves Assembly <br />Ea. <br />6 <br />$690 <br />$4,140 <br />f.3. Well Dewatering Pump Assembly <br />Ea. <br />14 <br />$5,900 <br />$82,600 <br />f.4. Well Dewatering Pump Installation <br />Ea. <br />14 <br />$500 <br />$7,000 <br />g. Miscellaneous <br />LS. <br />1 <br />$19,200 <br />$19,200 <br />10. Survey (Note 8) <br />L.S. <br />1 <br />$30,500 <br />$30,500 <br />TOTAL BID ITEM 1 <br />$919,700 <br />2. PUBLIC CONSTRUCTION BOND AND INSURANCE (TOTAL) <br />L.S. <br />1 <br />$10,4001 <br />$10,400 <br />3. MOBILIZATION AND DEMOBILIZATION (TOTAL) (Note 21 <br />L.S. <br />1 <br />$38,000 <br />$38,000 <br />4. CONTINGENCY ALLOWANCE (10% of sum of Bid Items 1, 2, and 3) <br />I.S. <br />1 <br />$96,810 <br />$96,810 <br />4.A. Change Order No. 1 <br />$145,409 <br />4.A.1 Remedlate Leachate drainage in Cell 2 <br />Billing Rates <br />NTE <br />$19,644.00 <br />$19,644 <br />4A.2 Florida let Clean - Video leachate collection system <br />IS <br />1 <br />$2,7501 <br />$2,750 <br />4.A.3 Florida Jet Clean - Jet Clean leachate collection system <br />LS <br />1 <br />$2,475 <br />$2,475 <br />4A.4 Extend LFG Collection horizontal Collectors <br />LF <br />600 <br />$61.80 <br />$37,080 <br />4.A.2 Extend LFG Additional Vertical Wells <br />LF <br />300 <br />$123 <br />$36,900 <br />4.A.2 Increase Condensate Force Main Plpeing 64nch (lAbS) <br />LF <br />720 <br />$33 <br />$23,760 <br />4A.2 Increase Condensate Force Main Pipeing 44nch (1Ab6) <br />LF <br />760 <br />$30 <br />$22,800 <br />Net Change Order No.,1 (Total Change Order 1- Contingency) <br />-',}•yy�'$48,599 <br />GRAND TOTAL BASE BID <br />$1,064,910 <br />S. ALTERNATE BID ITEM I- ACCESS RISERS WITH BLIND FLANGE <br />CAP Note9 <br />Ea. <br />12 <br />$300 <br />$3,600 <br />GRAND TOTAL CONTRACT VALUE <br />$1,068,510 <br />Change Order No. 1 <br />$48,599 <br />Grand Total After Change Order No. 1 <br />$1,117,109 <br />237 <br />6706-250111 <br />January 2021 <br />