My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/15/2021
CBCC
>
Meetings
>
2020's
>
2021
>
06/15/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2021 2:01:46 PM
Creation date
8/26/2021 1:57:21 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/15/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: I Jason E. Brown, County Administrator <br />THROUGH: Richard B. Szpyrka, P.E., Public Works Director <br />James W. Ennis, P.E. PMP, Assistant Public Works Director <br />FROM: Jill M. Williams, Contract Support Specialist <br />SUBJECT: Award of Bid No: 2021045 <br />4th Street Culvert Replacement at 90th Avenue (IRC -2022) <br />DATE: May 20, 2021 <br />DESCRIPTION AND CONDITIONS <br />On October 3`d, Indian River County Road & Bridge Staff discovered that the 96 -inch corrugated metal culvert <br />crossing under 4th Street at 90th Avenue had collapsed due to corrosion and had destroyed the overlying <br />roadway and was partially blocking the Indian River Farms Water Control District's Sub -Lateral D-4 Canal. Staff <br />stabilized the site and removed soil that was blocking the drainage conveyance; however, roadway restoration <br />was not able to be performed due to the size of the culvert. <br />The project consists of the replacement of an existing culvert at the intersection of 4th Street and 90th Avenue <br />and restoration of the 4th Street roadway. Other work will include sheet piling, temporary canal bypass, <br />earthwork, sodding, maintenance of traffic, erosion control and. any other incidental work required to complete <br />the project. <br />A bid opening for the project was held on May 19.2021. Nine (9) bids qualified bids were received. A detailed <br />bid tabulation is on file and available for viewing in the County Engineering Division. Bid totals are as follows: <br />COMPANY <br />BID <br />Florida Site Contracting <br />Vero Beach, Florida <br />$334,472.00 <br />Ferreira Construction Southern Division Co., Inc. <br />Hobe Sound, Florida <br />$342,170.35 <br />Loren Jock Trucking, Inc. <br />Stuart, Florida <br />$347,346.00 <br />Johnson -Davis, Inc. <br />Fort Pierce, Florida <br />$349,500.00 <br />Timothy Rose Contracting, Inc. <br />Vero Beach, Florida <br />$359,907.70 <br />Gregori Construction, Inc. <br />Titusville, Florida <br />$381,490.00 <br />Ryan Incorporated, Southern <br />Stuart, Florida <br />$419,517.00* <br />Hinterland Group, Inc. <br />Riviera Beach, FL <br />$486,230.00 <br />Boromei Construction, Inc. <br />Okeechobee, Florida <br />$591,510.00 <br />*Denotes mathematical errors on bid form corrected 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.