My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/15/2021
CBCC
>
Meetings
>
2020's
>
2021
>
06/15/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2021 2:01:46 PM
Creation date
8/26/2021 1:57:21 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/15/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: .. <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified\o\indic ated in the Contract <br />Documents. The Work is generally described as follows: <br />� <br />The project will consist of the replacement of an existing culvert atIthe,inter/ection of 41^ <br />Street and 901 Avenue, in the Indian River.F.arms Water\Control Disfrict,Sub-Lateral D-4 <br />Canal. The proposed pipe will be a 96�ReinforceConcrete d Corete Pipe (RCP)7with Rip -Rip <br />Rubble end treatment at the upstream, southerly end of the.pipe. Other)work will include <br />sheet piling, temporary canal bypass, earthwork, sodding, maintenance of traffic, erosion <br />control and any other incidental wor requi ed*to complete the pr`ojec't. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described,as follo-.ws: <br />Project Name`. 4T" <br />County Project,,Number,_IR( <br />Bid Number: \`2U11 <br />Proiect Address: Into <br />AMICLE,3 - ENGINEER <br />3.01 The Indian River�County_Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative, assume all duties and responsibilities, and have the <br />rights and authority�assigned to ENGINEER in the Contract Documents in connection with <br />the completio of -the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.