D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of subsurface
<br />conditions at or contiguous to the Site and all drawings of physical conditions in or relating
<br />to existing surface or subsurface structures at or contiguous to the Site (except Underground
<br />Facilities) which have been identified in the Supplementary Conditions as provided in
<br />paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous
<br />Environmental Condition, if any, at the Site which have been identified in the Supplementary
<br />Conditions as provided in paragraph 4.06 of the General Conditions.
<br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
<br />done so) all additional or supplementary examinations, investigations, explorations, tests,
<br />studies, and data concerning conditions (surface, subsurface, and Underground Facilities)
<br />at or contiguous to the Site which may affect cost, progress, or -performance of the Work or
<br />which relate to any aspect of the means, methods, techniques, sequences, and procedures
<br />of construction to be employed by CONTRACTOR, including/a/pplying the specific means,
<br />methods, techniques, sequences, and procedures of construction, if any, expressly required
<br />by the Contract Documents to be employed by CONTRACTOR;and,safety precautions and
<br />programs incident thereto _
<br />F. CONTRACTOR does not consider that any further examinations, fin'vestigations,
<br />explorations, tests, studies, or data are necessary for the performanceof�the Work at the
<br />Contract Price, within the Contract Times,-and`in accordance with the`gtlier terms and
<br />conditions of the Contract Documents
<br />G. CONTRACTOR is aware of
<br />others at the Site that relates
<br />rk to be`performed by OWNER and
<br />in the Contract Documents.
<br />H. CONTRACTOR has correlated tHe information knownto CONTRACTOR, information and
<br />observations obtained -from visits to\the Site, reports,and,drawings identified in the Contract
<br />Documents, and all'additional examinations6nvestigations, explorations, tests, studies, and
<br />data with the Contract -Documents.
<br />I. CONTRACTOR has given`ENGINEER written notice of all conflicts, errors, ambiguities, or
<br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the
<br />written resolut on thereof by ENGINEER is acceptable to CONTRACTOR.
<br />J.Caillterms
<br />ontract Documentsare .generally sufficient to indicate and convey understanding of
<br />and conditio nsTor performance and furnishing of the Work.
<br />K. Contractoris er gisteer� diwith and will use the Department of Homeland Security's
<br />E -Verify system,(www:e-verifv.gov) to confirm the employment eligibility of all newly
<br />hired employees for, the duration of this agreement, as required by Section 448.095, F.S.
<br />Contractor is also responsible for obtaining proof of E -Verify registration for all
<br />subcontractors. ,/
<br />ARTICLE 9 - CONTRACT DOCUMENTS
<br />9.01 Contents
<br />A. The Contract Documents consist of the following:
<br />1. This Agreement (pages 00520-1 to 00520-10, inclusive);
<br />2. Notice to Proceed (page 00550-1);