12.G.1. 07/06/2021 <br />1 <br />Option 1 <br />1 <br />• Seek the remaining easements necessary for a viable project <br />• Perform pre -construction monitoring <br />• Perform pre -construction monitoring in accordance with permit <br />conditions/adjust permit templates accordingly. <br />• Prepare bid documents and advertise in July, bid opening in September. <br />have a recorded easement agreement in place. <br />• Prior to award of bid, come back,to the BCC to reassess the amount of <br />easements. <br />➢ It is estimated that this approach;could cost in excess of $200,000.00 and still <br />may not yield a constructible project based on lack of easements. <br />unbuildable project. <br />Op tion 2 <br />• Perform pre -construction monitoring <br />• Construction activities utilize a modified fill template on properties that DO NOT <br />have a recorded easement agreement in place. <br />• Significantly reduce the amount of material needed for construction (reduces <br />quantity of material by approximately 35% project wide). <br />➢ Poses significant difficulties in construction activities/may even result in a <br />1 <br />unbuildable project. <br />➢ Could create an irregularly shaped berm system & lead to adverse impacts to <br />those oceanfront homeowners. <br />➢ Will significantly reduce the amount of storm protection offered in the original <br />design of the project <br />➢ NOT expected to be realized as a reduction in the cost of the project <br />