Laserfiche WebLink
MBV Engineering, Inc. for civil design services for each bus shelter location. Typically, each bus <br />shelter will require a concrete pad designed to ADA specifications, modifications to existing <br />drainage conditions, and connections to nearby sidewalks. <br />The Board approved the Continuing Consulting Engineering Services Agreement for Professional <br />Services with MBV Engineering, Inc. on April 17, 2018 and extended that agreement on May 18, <br />2021. In accordance with that agreement, MBV Engineering will provide professional services to <br />prepare engineering design plans and specifications.. <br />FUNDING <br />Grant funds from the Federal Transit Administration's (FTA) Section 5307 program will be used <br />to pay for the design and construction of the bus shelters. Through the Section 5307 program, <br />FTA covers 100% of all capital expenses of the public transportation system. Sufficient funds are <br />available in General Fund/Agencies/SRA/SRA Bus Shelter, Account # 00111041-066510-54001, <br />the County's existing Section 5307 grants, to cover the expenses associated with the bus shelter <br />program. <br />RECOMMENDATION <br />Staff recommends the Board approve Work Order No. 21 with-MBV Engineering,,Inc..for.design <br />of 'GoLine bus shelter locations. <br />Attachments: <br />1. Work Order No. 21 with MBV Engineering, Inc. for design of GoLine bus shelter locations <br />22 <br />