My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/06/2021
CBCC
>
Meetings
>
2020's
>
2021
>
07/06/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2021 2:58:45 PM
Creation date
8/26/2021 2:18:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/06/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00530 — EJCDC STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE <br />South Oslo Road WTP Improvements <br />THIS AGREEMENT ("Agreement" or "Contract"), dated the day of in the year <br />2021 by and between Indian River County, a political subdivision of the State of Florida (hereinafter <br />called OWNER) and .(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as <br />follows: <br />ARTICLE 1 WORK <br />CONTRACTOR as an independent contractor and not as an employee shall furnish and <br />complete all of the necessary labor, material, and equipment to perform the work as specified <br />or indicated in the Contract Documents'and per Indian County Department of Utility Services <br />(IRCDUS) standards. The work is generally described as follows: <br />Furnish all labor and materials necessary to construct the improvements to the existing <br />South Oslo Road Water Treatment Plant in Indian River County, Florida, including the <br />following but not limited to the work listed herein: site preparation, demolition, drainage <br />improvements, paving, grading, miscellaneous yard and process piping improvements, <br />feedwater pump motor replacement, transfer pump motor replacement, four (4) 1.875 mgd <br />nanofiltration trains, two (2) new high service pumps, chemical piping replacement, <br />electrical equipment, instrumentation,; valves, piping, WTP and wellfield PLC & SCADA <br />system ..equipment, :process .piping ,:trenches, painting and coatings; ;and all accessory <br />items to provide a complete operating system as depicted in these documents. Additive <br />alternates may or may not be included in whole or individually and is at the Owners full <br />discretion. ' <br />ARTICLE 2 ENGINEER <br />The South Oslo Road WTP Improvements project has been designed by Kimley-Horn and Associates, <br />Inc. hereinafter called ENGINEER, and who is to act as OWNER'S representative, assume duties and <br />responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in <br />connection with completion of the work in accordance with the Contract Documents. <br />ARTICLE 3 CONTRACT TIME <br />3.1 The CONTRACTOR shall be substantially completed with the following timeframe <br />(a) Within 60 calendar days from effective date of Notice to Proceed, Contractor shall <br />complete the following tasks: ' <br />,1. Obtain all necessary permits. <br />2. Submit shop drawings for all materials and equipment to be utilized on the job. <br />3. Perform all photographic recording and documentation of conditions prior to <br />construction. <br />4. Locate all existing utilities in the area of work. <br />5. Secure approval of shop drawings. <br />6. Mobilize all labor, equipment, and materials and prepare the site. <br />7. Notify all utilities and other affected parties prior to initiating construction. <br />00530-1 <br />87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.