My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-099B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-099B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2021 12:09:35 PM
Creation date
9/3/2021 12:06:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/13/2021
Control Number
2021-099B
Agenda Item Number
8.R.
Entity Name
All Webbs Enterprises, Inc.
Subject
Well Field Feasibility Study
Area
South & North County Reverse Osmosis Water Treatment Plants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and All Webbs <br />Enterprises, Inc., (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the <br />mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />Furnish all labor, equipment and materials necessary to deepen and test two (2) existing <br />Upper Floridan Aquifer wells (Well N7 and Well 51) for Indian River County Utilities <br />Department (OWNER). Well N7 located at the North County (Hobart Park) reverse osmosis <br />treatment facility and S1 is located at the South County (Oslo Road) reverse osmosis <br />treatment facility. The scope of work for each well will include: mobilization; removal of <br />portions of the existing wellhead, removal of the column pipe, pump, and appurtenances; <br />preliminary downhole video logging; deepening of the existing borehole; formation water <br />disposal system (including temporary piping and pumps, and compliance with discharge <br />permit requirements); performance of a full geophysical logging suite; installation of a <br />straddle packer and performance of a packer test to evaluate the confining unit; installation <br />of an off bottom packer and performance of a 24-hour constant rate aquifer performance <br />test (APT) of the Avon Park Permeable Zone (AAPZ); performance of a 24-hour constant rate <br />APT of the Upper Floridan Aquifer (UFA); optional back -plugging of the borehole with neat <br />cement; optional well acidization; pump development; step -drawdown testing; re- <br />installation of the permanent well pump, column pipe, and wellhead; well facility <br />disinfection; purging and bacteriological clearance; demobilization and restoration of the <br />well sites as described herein. <br />ARTICLE 2 -THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name: Well Field Feasibility Expansion <br />Project Address: South County Reverse Osmosis Water Treatment Plant <br />North County Reverse Osmosis Water Treatment Plant <br />ARTICLE 3 - CONTRACT TIMES <br />3.1 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final <br />payment as stated in the specifications are of the essence of the Agreement. <br />6 <br />3.2 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />
The URL can be used to link to this page
Your browser does not support the video tag.