Laserfiche WebLink
BID SCHEDULE OF VALUES <br />INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES <br />DEEPENING AND TESTING OF UFA WELL S3 & N7 <br />BIDDER'S NAME: wechs en1efo 9� "` <br />1. GENERAL CONDITIONS <br />ITEM <br />NO. <br />{TEM <br />QUANTITY <br />UNIT <br />UNITPRICE <br />ANT0LINT <br />1 <br />BONDS AND INSURANCE/GENERALCONDITIONS <br />1 <br />L$ <br />s25,000 <br />s25,000 <br />2 <br />UNDEFINED CONDITIONS ALLOWANCE (DRILL OUT Sl CEMENT PLUG AND BIT) <br />1 <br />LS <br />$50,000 <br />$50,000 <br />2. Sl DEEPENING AND TESTING <br />3 <br />MOBILIZATION/DEMOBILIZATION <br />1 <br />LS <br />E80,000 <br />$80,000 <br />4 <br />PULL EXISTING PUMP AND MOTOR <br />1 <br />LS <br />80,$00 <br />88.$00 <br />5 <br />PRELIMINARY DOWN HOLE VIDEO (STATIC AND DYNAMIC) <br />1 <br />LS <br />$4,000 <br />$4,000 <br />6 <br />FORMATION WATER DISPOSAL SYSTEM <br />1 <br />LS <br />siz000 <br />$12,000 <br />7 <br />DEEPENING OF EXISTING BOREHOLE FROM 800-1500 FEET BLS <br />700 <br />FT <br />$110 <br />$77,000 <br />8 <br />9 <br />GEOPHYSICAL LOGGING SUITE (XY CALIPER, DUAL IND., GAMMA, BHCS, SP, SPR, STATIC <br />& DYNAMIC FLUID COND., TEMP and FLOW) <br />INSTALL INFLATABLE STRADDLE PACKER FROM 850-900' BLS AND PERFORM PACKER <br />TESTOF CONFINING UNIT <br />1 <br />1 <br />LS <br />LS <br />81z,oao <br />$35,000 <br />812,000 <br />$35,000 <br />10 <br />INSTALL INFLATABLE OFF BOTTOM PACKER FROM Lal —900- BLS <br />1 <br />LS <br />$25.000 <br />$25,000 <br />11 <br />24-HOUR CONSTANT RATE PUMPING TEST OFAAPZ <br />1 <br />LS <br />s20.000 <br />$20,000 <br />12 <br />24-HOUR PUMPING TEST OF UFA <br />1 <br />LS <br />$20.000 <br />820.000 <br />13 <br />SET UP TO BACK PLUG BOREHOLE <br />1 <br />LS <br />$5,500 <br />$5,500 <br />14 <br />BACK PLUG BOREHOLE WITH NEAT CEMENT GROUT FROM APPROXIMATELY 1,250 -FEET <br />TO 1,500-FEETAND FROM 850 -FEET TO 900 -FEET <br />300 <br />LF <br />$sa <br />$1$,000 <br />15 <br />GRAVEL BACKFILL AAPZ FROM APPROXIMATELY 900-FEETTO 1,250 -FEET <br />400 <br />LF <br />sso <br />$20.000 <br />16 <br />WELL ACIDIZATION SETUP <br />1 <br />LS <br />s15.000 <br />$15.000 <br />17 <br />WELLACIDIZATION <br />4,000 <br />GAL <br />$5 <br />$20.000 <br />18 INSTALL <br />AND REMOVE PUMP DISCHARGE APPARATUS <br />1 <br />LS <br />s1s.000 <br />$15,000 <br />19 <br />PUMP DEVELOP WELL <br />60 <br />HR <br />$300 <br />$18,000 <br />20 <br />CONDUCT STEP-RATEP UM PI NG TEST <br />8 <br />HR <br />s3so <br />$2.800 <br />21 <br />FINAL DOWN HOLE VIDEO LOG (STATIC AND DYNAMIC) <br />1 <br />LS <br />s4,aoa <br />$4,000 <br />22 <br />RINSTALL PERMINANT WELL PUMP <br />1 <br />LS <br />$8.500 <br />$8.500 <br />23 <br />WELL DISINFECTION AND WATER QUALITY SAMPLING <br />1 <br />LS <br />s5.000 <br />$5.000 <br />24 SITE <br />RESTORATION <br />1 <br />LS <br />$20,000 <br />$20.000 <br />BF -1 <br />JW -01-28B JLA Geosciences, Inc. <br />